Loading
Page views this IP this session = 1 of 10 unsubscribed pagesMinnygap Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Minnygap Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Minnygap Wind Farm (Wind , Active) Location in the UK : Scotland, Dumfries Type of installation: Wind on/offshore: on Turbines :10 Capacity : 20 MW Approx Date of 1st power generation: March 2017
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
ERECTION OF TEN WIND TURBINES AND ASSOCIATED INFRASTRUCTURE, INCLUDING UPGRADING OF EXISTING ROADS, CONSTRUCTION OF INTERNAL ACCESS TRACKS AND VEHICULAR ACCESS FROM PUBLIC ROAD, ERECTION OF ONE PERMANENT METEOROLOGICAL MAST AND FOUR TEMPORARY METEOROLOGICAL MASTS, SUBSTATION AND CONTROL BUILDING AND EXTRACTION OF ROCK FROM TWO BORROW PITS (REVISED PROPOSAL TO THAT REFUSED UNDER 05/P/40349) Refused 2012
Appealed 2013
The proposed Minnygap Wind Farm, approximately 8km south west of Moffat, is estimated to generate electricity equivalent to the average annual demand of around 11,000-12,000 households .
Minnygap Wind Farm will consist of 10 turbines, each indicatively rated at 2MW and with an height of 125m to the top of the blade. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Nr Annandale , Dumfries and Galloway
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Minnygap 25 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Dumfries and Galloway Council
|
Site ID and Reference: |
4437 / A0480
District:
|
Applicant: |
Minnygap (formerly RES)
Application :
09/P/3/0340
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
10 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
25 |
Site Address: |
Nr Annandale
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
303800 / 303800
|
Development Status: |
Operational
|
Application Submitted: |
6/29/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
10/31/2012
|
Construction Date: |
11/1/2015
|
|
|
Generator Live |
3/15/2017
|
This Record Last Updated: |
5/31/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
10/31/2012 |
Site Name: |
Minnygap 30 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Dumfries and Galloway Council
|
Site ID and Reference: |
4521 / N00193W
District:
|
Applicant: |
Renewable Energy Systems (RES)
Application :
05/P/4/0349
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
15 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
30 |
Site Address: |
Nr Annandale
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
303800 / 303800
|
Development Status: |
Revised
|
Application Submitted: |
6/13/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
11/26/2007
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
9/25/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
11/26/2007 |
Site Name: |
Minnygap Wind Farm
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00260SQSC
|
Capacity: |
24800
|
Status: |
Live
|
Accreditation Date: |
6/13/2005
|
|
|
Commission Date: |
3/24/2017
|
|
|
Applicant: |
RES Ltd
|
Applicant Address: |
Beaufort Court
Egg Farm Lane
Kings Langley
WD4 8LR
England
|
Address: |
Minnygap Wind Farm
St. Ann's
Lockerbie
DG10 9PX
Scotland
|
Site Name: |
Minnygap Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02550NWSC
|
Capacity: |
24800
|
Status: |
Live
|
Accreditation Date: |
6/13/2005
|
|
|
Commission Date: |
3/24/2017
|
|
|
Applicant: |
RES Ltd
|
Applicant Address: |
Beaufort Court
Egg Farm Lane
Kings Langley
WD4 8LR
England
|
Address: |
Minnygap Wind Farm
St. Ann's
Lockerbie
DG10 9PX
Scotland
|
|
Assumptions: Capacity: 24800kW 24.8 MW, Thus over the month Capacity * 720 hours per month = 17856 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 7105 | 28.65% | Issued | 01/02/2018 | | | 5536 | 22.32% | Issued | 01/01/2018 | | | 7054 | 28.44% | Issued | 01/12/2017 | | | 6451 | 26.01% | Issued | 01/11/2017 | | | 6128 | 24.71% | Issued | 01/10/2017 | | | 7422 | 29.93% | Issued | 01/09/2017 | | | 3820 | 15.40% | Issued | 01/08/2017 | | | 3975 | 16.03% | Issued | 01/07/2017 | | | 3589 | 14.47% | Issued | 01/06/2017 | | | 6051 | 24.40% | Issued | 01/05/2017 | | | 2948 | 11.89% | Issued | 01/04/2017 | | | 1329 | 5.36% | Issued | 01/03/2017 | | | 1194 | 4.81% | Revoked |
|
Capacity: 40 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/24/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|