Penmanshiel Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Penmanshiel Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Penmanshiel Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Grantshouse, Scottish Borders    
Type of installation: Wind    on/offshore: on
Turbines :15  Capacity : 30 MW
Approx Date of 1st power generation: June 2016

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

RES is pleased to introduce our plans for a new wind farm at Penmanshiel, near Grantshouse, in the Scottish Borders. Penmanshiel Wind Farm will consist of 15 turbines with an indicative installed capacity of 30MW. This means that the proposed wind farm is estimated to generate electricity equivalent to the average demand of more than 17,000 households - or approximately 30% of the households in the Scottish Borders*. The proposed wind turbines will have a maximum blade tip height of 100m and an expected life of 25 years.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Land East of Penmanshiel Farmhouse Granthouse TD11 3RT Scotland

 Associated Companies.

Relationship Company (For: Penmanshiel )
DeveloperRES Renewable Energy Systems Ltd
OperatorRES Renewable Energy Systems Ltd
OwnerRES Renewable Energy Systems Ltd

 DECC Data on this Project: Penmanshiel :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Penmanshiel Wind Farm     28.7 MW
Energy Type: Wind Onshore
County: Borders     Country: Scotland     LPA: Scottish Borders Council
Site ID and Reference: 4600 / B0206     District:
Applicant: Renewable Energy Systems (RES)     Application : 11/01464/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 14 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 28
Site Address: Land East Of Penmanshiel Farmhouse Grantshouse Scottish Borders
 
County: Borders Region: Scotland
OS Coordinates: 380006 / 380006
Development Status: Operational
Application Submitted: 10/27/2011 Planning Permission Granted
Application Determined: Permission refused: 9/15/2012
Construction Date: 5/6/2015    
Generator Live 7/1/2016 This Record Last Updated: 5/31/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 9/15/2012

 OFGEM Data on this Project: Penmanshiel: Wind :

Site Name: Penmanshiel-GP
Generator Type: Wind
Scheme : REGO Generator ID: G02488NWSC
Capacity: 28500 Status: Live
Accreditation Date: 10/27/2011    
Commission Date: 6/16/2016    
Applicant: Penmanshiel Energy Ltd
Applicant Address: Santander UK Plc 2-3 Triton Square LONDON NW1 3AN England
Address: Land East of Penmanshiel Farmhouse Grantshouse TD11 3RT Scotland
 
Assumptions: Capacity: 28500kW 28.5 MW,
Thus over the month Capacity * 720 hours per month = 20520 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 7468 26.20% Issued
01/02/2018 7182 25.20% Issued
01/01/2018 9566 33.56% Issued
01/12/2017 8321 29.20% Issued
01/11/2017 8639 30.31% Issued
01/10/2017 3906 13.71% Issued
01/10/2017 5313 18.64% Issued
01/09/2017 5578 19.57% Issued
01/08/2017 4658 16.34% Issued
01/07/2017 5282 18.53% Issued
01/06/2017 6855 24.05% Issued
01/05/2017 4866 17.07% Issued
01/04/2017 7503 26.33% Issued
01/03/2017 6451 22.64% Redeemed
01/02/2017 9071 31.83% Redeemed
01/01/2017 7712 27.06% Redeemed
Dec-16 06908 7675 26.93% Issued
Nov-16 05160 5733 20.12% Issued
Oct-16 03443 3826 13.42% Issued
Sep-16 05166 5740 20.14% Issued
Aug-16 02498 2775 9.74% Issued
Jul-16 01707 44 0.15% Issued
Jun-16 0353 256 0.90% Issued

 Calculations


Capacity: 60
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 3/28/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 60 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 354464

Project Info
©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School