Nissan Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Nissan Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Nissan Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Tyne & Wear    
Type of installation: Wind    on/offshore: on
Turbines :10  Capacity : 6.6 MW
Approx Date of 1st power generation: November 2005

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Nissan Motors Plant- Sunderland: The six-turbine facility is the first wind farm within the global Nissan group and will generate 4 Megawatts a year - around 5% of the factory’s annual electricity requirement.

Nissan Motor Co.'s Sunderland plant in the UK will start the installation of two additional wind turbines in December 2007, bringing the total number of turbines on the site to eight. Expected to be fully operational in January 2008, the expanded farm will generate around 6% of the plant's annual energy requirement, cutting costs by nearly £1 million a year. Carbon dioxide emissions will also be cut by up to 4,000 tonnes per year at power plants supplying the factory with electricity.
Nissan Motors Extension additional 3 turbines at 0.66MW total of 1.98MW Completed December 2011

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Nissan Wind Farm Nissan Motor Manufacturing (UK) Limited Washington Sunderland SR5 3NS England

 Associated Companies.

Relationship Company (For: Nissan )
OwnerNissan
OperatorNissan

 DECC Data on this Project: Nissan :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Nissan Wind Farm Extension     4.3 MW
Energy Type: Wind Onshore
County: Tyne and Wear     Country: England     LPA: Sunderland City Council
Site ID and Reference: 5798 /     District:
Applicant: Nissan     Application : 15/02550/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 5 Turbine Capacity: 0.84999999999999998
Height of Turbines: 76 Calculated capacity: 4.25
Site Address: Nissan Motor Manufacturing, Washington Road, Usworth, Sunderland
  SR5 3NS
County: Tyne and Wear Region: North East
OS Coordinates: 433864 / 433864
Development Status: Planning Application Withdrawn
Application Submitted: 12/23/2015 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 12/20/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn: 11/7/2017    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Nissan Wind Farm     4 MW
Energy Type: Wind Onshore
County: Tyne and Wear     Country: England     LPA: Sunderland City Council
Site ID and Reference: 2944 / EN00167     District:
Applicant: Nissan Manufacturing UK     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 6 Turbine Capacity: 0.66000000000000003
Height of Turbines: Calculated capacity: 3.96
Site Address: Nissan plant, Sunderland
 
County: Tyne and Wear Region: North East
OS Coordinates: 433385 / 433385
Development Status: Operational
Application Submitted: 10/20/2004 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 11/1/2005 This Record Last Updated: 10/23/2009
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Nissan: Wind :

Site Name: Nissan Wind Farm - A,C,D
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00160RQEN
Capacity: 6480 Status: Live
Accreditation Date: 10/20/2004    
Commission Date: 11/1/2005    
Applicant: Nissan Motor Manufacturing (UK) Limited
Applicant Address: Nissan Motor Manufacturing (UK) Ltd Washington Road Sunderland Tyne and wear SR5 3NS
Address: Nissan Wind Farm Nissan Motor Manufacturing (UK) LimitedWashingto Sunderland SR5 3NS England

Site Name: Nissan Wind Farm - A,C,D
Generator Type: Wind
Scheme : REGO Generator ID: G00954NWEN
Capacity: 6480 Status: Live
Accreditation Date: 10/20/2004    
Commission Date: 11/1/2005    
Applicant: Nissan Motor Manufacturing (UK) Limited
Applicant Address: Nissan Motor Manufacturing (UK) Ltd Washington Road Sunderland Tyne and wear SR5 3NS
Address: Nissan Wind Farm Nissan Motor Manufacturing (UK) LimitedWashingto Sunderland SR5 3NS England
 
Assumptions: Capacity: 6480kW 6.48 MW,
Thus over the month Capacity * 720 hours per month = 4665.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 771 11.90% Issued
01/03/2018 1243 19.18% Issued
01/02/2018 809 12.48% Issued
01/01/2018 1131 17.45% Issued
01/12/2017 1095 16.90% Issued
01/11/2017 977 15.08% Issued
01/10/2017 1076 16.60% Issued
01/09/2017 576 8.89% Issued
01/08/2017 639 9.86% Issued
01/07/2017 636 9.81% Issued
01/06/2017 841 12.98% Issued
01/05/2017 582 8.98% Issued
01/04/2017 711 10.97% Issued
01/03/2017 653 10.08% Issued
01/02/2017 961 14.83% Issued
01/01/2017 712 10.99% Issued
Dec-16 0933 933 14.40% Issued
Nov-16 0664 664 10.25% Issued
Oct-16 0413 415 6.40% Issued
Sep-16 0636 636 9.81% Issued
Aug-16 0720 720 11.11% Issued
Jul-16 0555 555 8.56% Issued
Jun-16 0360 364 5.62% Issued
May-16 0623 623 9.61% Issued
Apr-16 0667 667 10.29% Issued
Mar-16 0683 683 10.54% Issued
Feb-16 0473 473 7.30% Issued
Jan-16 01318 1318 20.34% Issued
Oct-15 0271 276 4.26% Issued
Sep-15 0357 360 5.56% Issued
Aug-15 0667 667 10.29% Issued
Jul-15 529526 529 8.16% Expired
Jun-15 703703 703 10.85% Expired
May-15 10101010 1010 15.59% Expired
Apr-15 658657 657 10.14% Expired
Mar-15 11651166 1166 17.99% Expired
Feb-15 927927 927 14.31% Expired
Jan-15 15261526 1526 23.55% Expired
Dec-14 11901189 1189 18.35% Expired
Nov-14 558558 558 8.61% Expired
Oct-14 980980 980 15.12% Expired
Sep-14 5653 56 0.86% Expired
Aug-14 823822 822 12.69% Expired
Jul-14 355351 355 5.48% Expired
Jun-14 174169 174 2.69% Expired
May-14 400397 400 6.17% Expired
Apr-14 545542 545 8.41% Expired
Mar-14 889888 888 13.70% Expired
Feb-14 12311232 1231 19.00% Expired
Jan-14 988988 987 15.23% Expired
Dec-13 15001500 1499 23.13% Expired
Nov-13 795795 795 12.27% Expired
Oct-13 11311131 1131 17.45% Expired
Sep-13 577578 578 8.92% Expired
Aug-13 505502 505 7.79% Expired
Jul-13 278273 278 4.29% Expired
Jun-13 391387 390 6.02% Expired
May-13 952952 952 14.69% Expired
Apr-13 920920 920 14.20% Expired
Mar-13 992992 992 15.31% Expired
Feb-13 730730 730 11.27% Expired
Jan-13 821821 821 12.67% Expired
Dec-12 976976 976 15.06% Expired
Nov-12 903903 903 13.94% Expired
Oct-12 502502 505 7.79% Expired
Sep-12 884885 885 13.66% Expired
Aug-12 431431 435 6.71% Expired
Jul-12 437437 440 6.79% Expired
Jun-12 455454 457 7.05% Expired
May-12 411412 415 6.40% Expired
Apr-12 554556 556 8.58% Expired
Mar-12 491491 494 7.62% Expired
Feb-12 867869 869 13.41% Expired
Jan-12 522522 522 8.06% Expired
Dec-11 13661366 1366 21.08% Expired
Nov-11 809811 811 12.52% Expired
Oct-11 10351037 1037 16.00% Expired
Sep-11 907908 908 14.01% Expired
Aug-11 448448 452 6.98% Expired
Jul-11 325325 329 5.08% Expired
Jun-11 390390 393 6.06% Expired
May-11 10341035 1035 15.97% Expired
Apr-11 528528 537 8.29% Expired
Mar-11 370370 375 5.79% Expired
Feb-11 691692 694 10.71% Expired
Jan-11 794795 795 12.27% Expired
Dec-10 707709 709 10.94% Expired
Nov-10 10421044 1044 16.11% Expired
Oct-10 887889 889 13.72% Expired

 Calculations


Capacity: 13.2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 3/29/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 13.2 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351864

Project Info
bbc news item

Case Study

AutoblogGreen

New solar farm switched on at NISSAN Sunderland
NISSAN has switched on a new solar farm at its biggest manufacturing site in Europe. Made of up 19,000 photo-voltaic panels, the new 4.75MW facility is now fully operational at NISSAN Sunderland Plant.

NISSAN seeks fair wind for farm
The car maker plans to power the factory with seven turbines, capable of producing enough electricity to power the equivalent of 2,600 homes.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom