Barmoor Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Barmoor Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Barmoor Wind Farm (Wind , Active)

 General Information.

Location in the UK : England,    
Type of installation: Wind    on/offshore: on
Turbines :6  Capacity : 13.8 MW
Approx Date of 1st power generation: Jan 2015

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Barmoor Renewable Energy and Wind Farm Supporters (BREWS) are backing the proposal from Catamount and Force 9 Energy to build 10 turbines, each 360 feet high, at Barmoor South Moor.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Barmoor Wind FarmNear LowickBerwick TD15 2QD England

 Associated Companies.

Relationship Company (For: Barmoor )
DeveloperCatamount Energy Limkited
DeveloperEDF Energy Renewables
OwnerEDF Energy Renewables
DeveloperForce 9 Energy

 DECC Data on this Project: Barmoor :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Barmoor South Wind Farm     13.8 MW
Energy Type: Wind Onshore
County: Northumberland     Country: England     LPA: Northumberland County Council
Site ID and Reference: 4163 / A0544     District:
Applicant: EDF     Application : C/07/00180/CPC (Go to search to find Application)
For Wind Farms  
Number of Turbines: 6 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 13.8
Site Address: Between Ford And Lowick Bowsden Berwick-upon-Tweed
 
County: Northumberland Region: North East
OS Coordinates: 398519 / 398519
Development Status: Operational
Application Submitted: 11/22/2007 Planning Permission Granted
Application Determined: Permission refused: 12/17/2007
Construction Date: 3/1/2014    
Generator Live 1/19/2015 This Record Last Updated: 1/20/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 12/17/2007

Site Name: Barmoor     27 MW
Energy Type: Wind Onshore
County: Northumberland     Country: England     LPA: Northumberland County Council
Site ID and Reference: 3280 / N00454W     District:
Applicant: Force 9 Energy/Catamount     Application : 06/B/0148 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 9 Turbine Capacity: 0
Height of Turbines: Calculated capacity:
Site Address: NE of Ford
 
County: Northumberland Region: North East
OS Coordinates: 398000 / 398000
Development Status: Revised
Application Submitted: 3/2/2006 Planning Permission Granted
Application Determined: Permission refused: 3/27/2008
Construction Date:    
Generator Live This Record Last Updated: 6/10/2009
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 3/27/2008

 OFGEM Data on this Project: Barmoor: Wind :

Site Name: Barmoor
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00350RQEN
Capacity: 11920 Status: Live
Accreditation Date: 3/2/2006    
Commission Date: 12/22/2014    
Applicant: BARMOOR WIND POWER LIMITED
Applicant Address: 40 GROSVENOR PLACE LONDON SW1X 7EN England
Address: Barmoor Wind Farm Near Lowick Berwick TD15 2QD England

Site Name: Barmoor
Generator Type: Wind
Scheme : REGO Generator ID: G02590NWEN
Capacity: 11920 Status: Live
Accreditation Date: 3/2/2006    
Commission Date: 12/22/2014    
Applicant: BARMOOR WIND POWER LIMITED
Applicant Address: 40 GROSVENOR PLACE LONDON SW1X 7EN England
Address: Barmoor Wind Farm Near Lowick Berwick TD15 2QD England
 
Assumptions: Capacity: 11920kW 11.92 MW,
Thus over the month Capacity * 720 hours per month = 8582.4 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 3818 32.03% Issued
01/02/2018 3033 25.44% Issued
01/01/2018 4326 36.29% Issued
01/12/2017 4186 35.12% Issued
01/11/2017 3879 32.54% Issued
01/10/2017 4097 34.37% Issued
01/09/2017 2285 19.17% Issued
01/08/2017 2435 20.43% Issued
01/07/2017 2500 20.97% Issued
01/06/2017 2852 23.93% Issued
01/05/2017 2150 18.04% Issued
01/04/2017 3015 25.29% Issued
01/03/2017 3243 27.21% Redeemed
01/02/2017 3807 31.94% Redeemed
01/01/2017 3650 30.62% Redeemed
Dec-16 03698 4109 34.47% Issued
Nov-16 02549 2832 23.76% Issued
Oct-16 01807 2007 16.84% Issued
Sep-16 02322 2580 21.64% Issued
Aug-16 02461 2735 22.94% Issued
Jul-16 01995 2217 18.60% Issued
Jun-16 01195 1344 11.28% Issued
Jun-16 01195 1344 11.28% Issued
May-16 01981 2214 18.57% Issued
Apr-16 01836 2040 17.11% Issued
Mar-16 02002 2224 18.66% Redeemed
Feb-16 03009 3343 28.05% Redeemed
Jan-16 03780 4200 35.23% Redeemed
Dec-15 04255 4728 39.66% Redeemed
Nov-15 03741 4157 34.87% Redeemed
Oct-15 01753 1963 16.47% Redeemed
Sep-15 01413 1586 13.31% Redeemed
Aug-15 02194 2437 20.44% Redeemed
Jul-15 21031881 2102 17.63% Redeemed
Jun-15 25642295 2565 21.52% Redeemed
May-15 34693122 3469 29.10% Redeemed
Apr-15 24152162 2416 20.27% Redeemed
Mar-15 42213798 4221 35.41% Expired
Feb-15 36033243 3603 30.23% Expired
Jan-15 55064955 5506 46.19% Expired
Dec-14 983887 986 8.27% Expired

 Calculations


Capacity: 36
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 3/29/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 36 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 354305

Project Info
EDF Energy: BARMOOR

SOUL, The BARMOOR Anti Wind Farm Group

Force 9 Energy Ltd : BARMOOR wind farm

BARMOOR - FAREWELL THE ‘FAR HORIZONS’
They are using Danish Vestas V90 Gridstreamers which have a 2MW headline capacity. Both the towers and the blades are manufactured in Spain.

WATCH: BARMOOR receives turbine deliveries
The 12 megawatt scheme will incorporate six turbines with a height, from ground to the tips of the blades, of 110 metres and will produce enough low carbon electricity to supply the average annual electricity needs of up to 6,400 homes.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School