Sorry I found no matches, Please try again. 176
vid = 247pws_id = pws_id = Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.80.155.163 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Llandinam Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Llandinam Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Llandinam Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, Powys    
Type of installation: Wind    on/offshore: on
Turbines :103  Capacity : 30.9 MW
Approx Date of 1st power generation: Repowering: 2014

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Also known as Penrhyddlan and Llidiartywaun

Plans have been unveiled in Powys to turn one of the largest wind farms in the UK into one of the tallest

• Repowering and Extension

- Erection of 34 proposed wind turbines
- Crane hardstanding areas ;
- Upgrading and construction of on-site access tracks, turning areas, and
associated watercourse crossings and drainage works;
- Upgrading of the site access from the A483 road;
- Construction of an on-site substation;
- Installation of two Permanent Power Performance Assessment (PPA)
meteorological masts; and
- Installation of on-site underground cabling.

The Development will comprise 34 three-bladed horizontal axis wind turbines with a height envelope of up to 122 m to blade tip, and a total installed capacity of up to 102MW. A range of turbines is commercially available; the final choice of turbine will be based upon attaining maximum wind yield from the Development whilst adhering to the technical and environmental constraints posed by the site. The “candidate” turbine, on which assessments have been based, is the Siemens SWT-2.3-82 with a hub height of 80 m and rotor diameter of 82.4 m, thus giving a total height to blade tip of 121.2 m (compared with 45.5 m for the existing turbines). Other turbines of similar physical size with outputs of up to 3 MW are
available.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Llidiartywaun Wind Farm Celt Power Ltd. Bryn Dadlam Mochdre Newton SY16 1RB Wales

 Associated Companies.

Relationship Company (For: Llandinam )
DeveloperScottish Power Renewables
OperatorScottish Power Renewables

 DECC Data on this Project: Llandinam :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Llandinam Windfarm Repowering and Extension     102 MW
Energy Type: Wind Onshore
County: Powys     Country: Wales     LPA: DECC (S36)
Site ID and Reference: 3983 / EN00552     District:
Applicant: Scottish Power (formerly CeltPower Ltd/Eurus Energy)     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 34 Turbine Capacity: 3
Height of Turbines: Calculated capacity: 102
Site Address: 10km south of Newtown,
 
County: Powys Region: Wales
OS Coordinates: 303400 / 303400
Development Status: Planning Permission Granted
Application Submitted: 5/8/2008 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 6/25/2020
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 9/7/2025    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Llandinam Windfarm     31 MW
Energy Type: Wind Onshore
County: Powys     Country: Wales     LPA: Powys County Council
Site ID and Reference: 3057 / EN00551     District:
Applicant: CELTPOWER LTD     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 103 Turbine Capacity: 0.29999999999999999
Height of Turbines: Calculated capacity: 30.9
Site Address: 10km south of Newtown
 
County: Powys Region: Wales
OS Coordinates: 302840 / 302840
Development Status: Operational
Application Submitted: Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 1/1/1993 This Record Last Updated: 12/4/2009
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Llandinam: Wind :

Site Name: Llidiartywaun Wind Farm - A
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00037RQWA
Capacity: 18900 Status: Live
Accreditation Date:    
Commission Date: 12/1/1992    
Applicant: ScottishPower Renewables (UK) Limited
Applicant Address: Arnott House 12-16 Bridge Street Belfast BT1 1LB Northern Ireland
Address: Llidiartywaun Wind Farm Celt Power Ltd.Bryn DadlamMochdreNewton SY16 1RB Wales

Site Name: Llidiartywaun Wind Farm - A
Generator Type: Wind
Scheme : REGO Generator ID: G00525NWWA
Capacity: 18900 Status: Live
Accreditation Date:    
Commission Date: 12/1/1992    
Applicant: ScottishPower Renewables (UK) Limited
Applicant Address: Arnott House 12-16 Bridge Street Belfast BT1 1LB Northern Ireland
Address: Llidiartywaun Wind Farm Celt Power Ltd.Bryn DadlamMochdreNewton SY16 1RB Wales
 
Assumptions: Capacity: 18900kW 18.9 MW,
Thus over the month Capacity * 720 hours per month = 13608 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 2598 13.75% Issued
01/02/2018 2796 14.79% Issued
01/01/2018 5110 27.04% Issued
01/12/2017 3566 18.87% Issued
01/11/2017 2256 11.94% Issued
01/10/2017 4330 22.91% Issued
01/09/2017 2301 12.17% Issued
01/08/2017 1677 8.87% Issued
01/07/2017 1647 8.71% Issued
01/06/2017 2390 12.65% Issued
01/05/2017 1808 9.57% Issued
01/04/2017 1276 6.75% Issued
01/03/2017 3724 19.70% Redeemed
01/02/2017 3697 19.56% Redeemed
01/01/2017 2565 13.57% Redeemed
Dec-16 03214 3231 17.10% Retired
Nov-16 02163 2186 11.57% Issued
Oct-16 01703 1732 9.16% Issued
Sep-16 02298 2319 12.27% Issued
Aug-16 02305 2332 12.34% Issued
Jul-16 02080 2106 11.14% Issued
Jun-16 0776 819 4.33% Issued
Jun-16 0776 819 4.33% Issued
May-16 01498 1525 8.07% Issued
Apr-16 01920 1950 10.32% Issued
Mar-16 02497 2528 13.38% Redeemed
Feb-16 03705 3705 19.60% Redeemed
Jan-16 04407 4407 23.32% Redeemed
Dec-15 06778 6778 35.86% Redeemed
Nov-15 05093 5093 26.95% Redeemed
Oct-15 01636 1668 8.83% Redeemed
Sep-15 01117 1147 6.07% Redeemed
Aug-15 01780 1811 9.58% Redeemed
Jul-15 25392519 2540 13.44% Redeemed
Jun-15 21422119 2141 11.33% Redeemed
May-15 37683768 3768 19.94% Redeemed
Apr-15 23692338 2369 12.53% Redeemed
Mar-15 40444022 4044 21.40% Redeemed
Feb-15 28212801 2821 14.93% Redeemed
Jan-15 50995099 5099 26.98% Redeemed
Dec-14 52765276 5276 27.92% Redeemed
Nov-14 25432521 2543 13.46% Redeemed
Oct-14 39993999 3999 21.16% Redeemed
Sep-14 640593 640 3.39% Redeemed
Aug-14 27972777 2797 14.80% Redeemed
Jul-14 936896 936 4.95% Redeemed
Jun-14 434382 434 2.30% Redeemed
May-14 20632028 2064 10.92% Redeemed
Apr-14 19091879 1908 10.10% Redeemed
Mar-14 32483230 3248 17.19% Redeemed
Feb-14 53475347 5347 28.29% Redeemed
Jan-14 46694669 4669 24.70% Redeemed
Dec-13 53675367 5367 28.40% Redeemed
Nov-13 24022371 2402 12.71% Redeemed
Oct-13 40864086 4086 21.62% Redeemed
Sep-13 17141683 1714 9.07% Redeemed
Aug-13 15521525 1552 8.21% Redeemed
Jul-13 896852 896 4.74% Redeemed
Jun-13 21482125 2148 11.37% Redeemed
May-13 28562829 2856 15.11% Redeemed
Apr-13 32273227 3227 17.07% Redeemed
Mar-13 29212898 2921 15.46% Expired
Feb-13 26762652 2675 14.15% Redeemed
Jan-13 31363111 3136 16.59% Redeemed
Dec-12 45414541 4541 24.03% Redeemed
Nov-12 28632841 2863 15.15% Redeemed
Oct-12 28102788 2809 14.86% Redeemed
Sep-12 30643064 3064 16.21% Redeemed
Aug-12 10391018 1039 5.50% Redeemed
Jul-12 11731142 1174 6.21% Redeemed
Jun-12 22112185 2211 11.70% Redeemed
May-12 12261190 1226 6.49% Redeemed
Apr-12 17131686 1712 9.06% Redeemed
Mar-12 13041274 1304 6.90% Redeemed
Feb-12 494451 495 2.62% Redeemed
Dec-11 486395 485 2.57% Redeemed
Nov-11 36823683 3683 19.49% Redeemed
Oct-11 47244724 4724 24.99% Redeemed
Sep-11 40674067 4067 21.52% Redeemed
Aug-11 15411511 1541 8.15% Redeemed
Jul-11 11831137 1184 6.26% Redeemed
Jun-11 20141991 2014 10.66% Redeemed
May-11 46994699 4699 24.86% Redeemed
Apr-11 19911960 295 1.56% Redeemed
Mar-11 18051762 1805 9.55% Redeemed
Feb-11 31943195 3195 16.90% Redeemed
Jan-11 29272899 2926 15.48% Redeemed
Dec-10 11521116 1153 6.10% Redeemed
Nov-10 29512923 2950 15.61% Redeemed
Oct-10 33903369 3390 17.94% Redeemed

 Calculations


Capacity: 30.9000000000001
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 3/29/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 30.9000000000001 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio

Project Info
LLANDINAM Windfarm

Five Powys wind farm projects rejected and one approved
A sixth proposal - to upgrade an existing wind farm at LLANDINAM - was approved, but plans for a power line to link it to the grid were rejected.

Tallest wind farm plan unveiled

Npower

LLANDINAM Repowering

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School