Loading
Page views this IP this session = 1 of 10 unsubscribed pagesChelveston Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Chelveston Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Chelveston Wind Farm (Wind , Active) Location in the UK : England, Chelveston Airfield Type of installation: Wind on/offshore: on Turbines :9 Capacity : 22.5 MW Approx Date of 1st power generation: February 2014
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Chelveston Renewable Energy park:a biomass Anaerobic Digestion plant and bio-fuelled generators have been approved with the capacity to produce 2 and 6MW of renewable electricity respectively to feed into the local network.
125m high to blade tip.
Current plans for a windfarm will complement these facilities and take the capacity to over 30MW. With the windfarm fully integrated within the renewable energy park CREL will be able to export a base load from the biomass plant of 1.5 MW with on average, approaching 7MW from the wind power. A further 6MW will be available on demand from the biofuelled engine generators at times of low windpower or high electricity demand. Together these can provide an estimated annual 109,000 MWh of renewable electricity sufficient for 27,500 households and offsetting some 47,000 tonnes a year of CO2 emissions from power stations. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Chelveston Renewable Energy Park Chelveston NN9 6AR England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Chelveston Renewable Energy Park Wind Farm (Bedford) 10 MW
|
Energy Type: |
Wind Onshore |
County: |
Northamptonshire Country: England LPA: Bedford Borough Council
|
Site ID and Reference: |
3795 / AA224
District:
|
Applicant: |
Chelveston Renewable Energy Ltd
Application :
10/00484/MAF
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
4 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
10 |
Site Address: |
Chelveston Airfield, East Northamptonshore
|
|
|
County: |
Northamptonshire Region: East Midlands
|
OS Coordinates: |
499823 / 499823
|
Development Status: |
Operational
|
Application Submitted: |
3/24/2010
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
3/29/2011
|
Construction Date: |
8/1/2013
|
|
|
Generator Live |
2/15/2014
|
This Record Last Updated: |
5/6/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
3/29/2011 |
Site Name: |
Chelveston Renewable Energy Park Wind Farm (East Northamptonshire) 12.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Northamptonshire Country: England LPA: East Northamptonshire Council
|
Site ID and Reference: |
3946 / EN00237
District:
|
Applicant: |
Chelveston Renewable Energy
Application :
10/00415/FUL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
5 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
12.5 |
Site Address: |
Chelveston Airfield
East Northamptonshore
|
|
|
County: |
Northamptonshire Region: East Midlands
|
OS Coordinates: |
499885 / 499885
|
Development Status: |
Operational
|
Application Submitted: |
3/3/2010
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
3/7/2011
|
Construction Date: |
8/1/2013
|
|
|
Generator Live |
2/15/2014
|
This Record Last Updated: |
5/6/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
3/7/2011 |
Site Name: |
Chelveston Renewable Energy
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00312RQEN
|
Capacity: |
25650
|
Status: |
Live
|
Accreditation Date: |
3/3/2010
|
|
|
Commission Date: |
9/20/2013
|
|
|
Applicant: |
Chelveston Renewable Energy Ltd
|
Applicant Address: |
Grant Thornton House
Kettering Parkway
Kettering Venture Park
Kettering
NN15 6XR
England
|
Address: |
Chelveston Renewable Energy
Chelveston Renewable Energy Park
Chelveston
NN9 6AR
England
|
Site Name: |
Chelveston Renewable Energy
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02256NWEN
|
Capacity: |
25650
|
Status: |
Live
|
Accreditation Date: |
3/3/2010
|
|
|
Commission Date: |
9/20/2013
|
|
|
Applicant: |
Chelveston Renewable Energy Ltd
|
Applicant Address: |
Grant Thornton House
Kettering Parkway
Kettering Venture Park
Kettering
NN15 6XR
England
|
Address: |
Chelveston Renewable Energy
Chelveston Renewable Energy Park
Chelveston
NN9 6AR
England
|
|
Assumptions: Capacity: 25650kW 25.65 MW, Thus over the month Capacity * 720 hours per month = 18468 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/05/2018 | | | 3025 | 11.79% | Issued | 01/04/2018 | | | 4986 | 19.44% | Issued | 01/03/2018 | | | 6033 | 23.52% | Issued | 01/02/2018 | | | 5718 | 22.29% | Issued | 01/01/2018 | | | 8351 | 32.56% | Issued | 01/12/2017 | | | 7603 | 29.64% | Issued | 01/11/2017 | | | 5566 | 21.70% | Issued | 01/10/2017 | | | 7444 | 29.02% | Issued | 01/09/2017 | | | 2 | 0.01% | Issued | 01/09/2017 | | | 3626 | 14.14% | Issued | 01/08/2017 | | | 3455 | 13.47% | Issued | 01/07/2017 | | | 3396 | 13.24% | Issued | 01/06/2017 | | | 4868 | 18.98% | Issued | 01/05/2017 | | | 3827 | 14.92% | Issued | 01/04/2017 | | | 3242 | 12.64% | Issued | 01/03/2017 | | | 6455 | 25.17% | Redeemed | 01/02/2017 | | | 5870 | 22.88% | Redeemed | 01/01/2017 | | | 4576 | 17.84% | Redeemed | 01/01/2017 | | | 5 | 0.02% | Issued | Dec-16 | 0 | 4932 | 4927 | 19.21% | Issued | Nov-16 | 0 | 4786 | 4786 | 18.66% | Issued | Oct-16 | 0 | 3432 | 1 | 0.00% | Issued | Oct-16 | 0 | 0 | 3432 | 13.38% | Issued | Sep-16 | 0 | 4459 | 4459 | 17.38% | Issued | Aug-16 | 0 | 4170 | 4170 | 16.26% | Issued | Jul-16 | 0 | 3742 | 3742 | 14.59% | Issued | Jul-16 | 0 | 3742 | 3742 | 14.59% | Issued | Jun-16 | 0 | 2359 | 3 | 0.01% | Issued | May-16 | 0 | 4179 | 4179 | 16.29% | Issued | Mar-16 | 0 | 5243 | 5243 | 20.44% | Redeemed | Feb-16 | 0 | 7072 | 7072 | 27.57% | Redeemed | Dec-15 | 0 | 11538 | 11538 | 44.98% | Redeemed | Nov-15 | 0 | 8613 | 8613 | 33.58% | Redeemed | Oct-15 | 0 | 3231 | 3231 | 12.60% | Redeemed | Sep-15 | 0 | 2805 | 5 | 0.02% | Issued | Aug-15 | 0 | 3586 | 3586 | 13.98% | Redeemed | Jul-15 | 4320 | 4321 | 4320 | 16.84% | Redeemed | Jun-15 | 3997 | 3997 | 3997 | 15.58% | Redeemed | May-15 | 5143 | 5143 | 5143 | 20.05% | Redeemed | Apr-15 | 3387 | 3387 | 3387 | 13.20% | Redeemed | Mar-15 | 6757 | 6758 | 6757 | 26.34% | Redeemed | Feb-15 | 5255 | 5255 | 5255 | 20.49% | Redeemed | Jan-15 | 9091 | 9092 | 9091 | 35.44% | Redeemed | Dec-14 | 8985 | 8984 | 8984 | 35.03% | Redeemed | Nov-14 | 4454 | 4454 | 4454 | 17.36% | Redeemed | Oct-14 | 6590 | 6591 | 1 | 0.00% | Expired | Sep-14 | 1416 | 1389 | 1415 | 5.52% | Redeemed | Aug-14 | 4905 | 4905 | 4905 | 19.12% | Redeemed | Jul-14 | 2580 | 2564 | 2580 | 10.06% | Redeemed | Jun-14 | 1770 | 1744 | 9 | 0.04% | Expired | May-14 | 4159 | 4177 | 4159 | 16.21% | Redeemed | Apr-14 | 3562 | 3576 | 14 | 0.05% | Expired | Mar-14 | 5598 | 5609 | 11 | 0.04% | Expired | Feb-14 | 9920 | 9922 | 2 | 0.01% | Expired | Jan-14 | 8588 | 8591 | 3 | 0.01% | Expired | Dec-13 | 9068 | 9074 | 6 | 0.02% | Expired | Nov-13 | 4840 | 4848 | 8 | 0.03% | Expired | Oct-13 | 7234 | 7238 | 4 | 0.02% | Expired | Sep-13 | 746 | 642 | 640 | 2.50% | Expired |
|
Capacity: 45 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/24/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|