Sorry I found no matches, Please try again. 176
vid = 2245pws_id = 353480pws_id = 353480 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.116.118.198 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Whitchurch Solar Farm

Subscribers see an interactive map with Whitchurch Solar Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Solar projects and details.


Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm


Subscribe for £500 to include full csv and KML downloads of all Solar project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Whitchurch Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, Chilcompton, Bath, Avon,    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 5 MW
Acreage:20   or approx Hectares : 8
Approx Date of 1st power generation: May 2013

/YES

 Comment

The Whitchurch Farm Solar Park is flat, on top of a hill with no visibility issues on Grade 3 land, good screening from existing mature hedging with good drainage and minimal flood risk. There is a 33kV grid connection in an adjoining field owned by the landowner.
34 acres
Mr J Pertwee, Hive

 Address

Chilcompton, Bath, Avon, BA3 4DW

 Associated Companies.

Relationship Company (For: Whitchurch )
ElectricianDNO Consulting Limited
OperatorHive Energy
DeveloperHive Energy

 DECC Data on this Project: Whitchurch :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: SOLAR PARK - WHITCHURCH FARM     6.5 MW
Energy Type: Solar Photovoltaics
County: Somerset     Country: England     LPA: Mendip District Council
Site ID and Reference: 1620 / C0122     District:
Applicant: Anesco     Application : 2012/0554 (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Whitchurch Farm, Chilcompton, Bath, Avon
  BA3 4DW
County: Somerset Region: South West
OS Coordinates: 363439 / 363439
Development Status: Operational
Application Submitted: 4/13/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 1/17/2014 This Record Last Updated: 4/3/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Whitchurch: Solar :

Site Name: Whitchurch
Generator Type: Photovoltaic (RO code = RU)
Scheme : RO Generator ID: R00198RUEN
Capacity: 4980 Status: Live
Accreditation Date: 4/13/2012    
Commission Date: 1/9/2014    
Applicant: Photon Power Limited
Applicant Address: Unit 9 Easter Park READING RG7 2PQ England
Address: Whitchurch Farm Ston Easton Radstock BA3 4DW England

Site Name: Whitchurch
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G05231PVEN
Capacity: 4980 Status: Live
Accreditation Date: 4/13/2012    
Commission Date: 1/9/2014    
Applicant: Photon Power Limited
Applicant Address: Unit 9 Easter Park READING RG7 2PQ England
Address: Whitchurch Farm Ston Easton Radstock BA3 4DW England
 
Assumptions: Capacity: 4980kW 4.98 MW,
Thus over the month Capacity * 720 hours per month = 3585.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 582 11.69% Issued
01/03/2018 437 8.78% Issued
01/02/2018 399 8.01% Issued
01/01/2018 139 2.79% Issued
01/12/2017 107 2.15% Issued
01/11/2017 222 4.46% Issued
01/10/2017 355 7.13% Issued
01/09/2017 549 11.02% Issued
01/08/2017 735 14.76% Issued
01/07/2017 844 16.95% Issued
01/06/2017 860 17.27% Issued
01/05/2017 847 17.01% Issued
01/04/2017 788 15.82% Issued
01/03/2017 498 10.00% Redeemed
01/02/2017 213 4.28% Redeemed
01/01/2017 171 3.43% Redeemed
Dec-16 0179 119 2.39% Issued
Nov-16 0274 176 3.53% Issued
Oct-16 0669 422 8.47% Issued
Sep-16 0854 537 10.78% Issued
Aug-16 01280 800 16.06% Issued
Jul-16 01465 916 18.39% Issued
Jun-16 01113 696 13.98% Issued
Apr-16 01206 754 15.14% Issued
Dec-15 0136 90 1.81% Redeemed
Nov-15 0196 127 2.55% Redeemed
Oct-15 0548 347 6.97% Redeemed
Sep-15 01110 694 13.94% Redeemed
Aug-15 01031 644 12.93% Redeemed
Jul-15 8361338 836 16.79% Redeemed
Jun-15 9641541 963 19.34% Redeemed
May-15 8621379 862 17.31% Redeemed
Apr-15 8951432 895 17.97% Redeemed
Mar-15 567901 567 11.39% Redeemed
Feb-15 310490 311 6.24% Redeemed
Jan-15 182288 181 3.63% Redeemed
Dec-14 154238 154 3.09% Redeemed
Nov-14 167261 168 3.37% Redeemed
Oct-14 362572 362 7.27% Redeemed
Sep-14 605962 605 12.15% Redeemed
Aug-14 7561209 756 15.18% Redeemed
Jul-14 10181629 1018 20.44% Redeemed
Jun-14 9221474 921 18.49% Redeemed
May-14 7661219 766 15.38% Redeemed
Apr-14 545863 544 10.92% Redeemed
Mar-14 573908 574 11.53% Redeemed
Feb-14 295460 295 5.92% Expired
Jan-14 103148 104 2.09% Redeemed

Project Info
Council objects to north Shropshire solar farm bid Read more at http://www.shrop
An application to build the park to the north east of Combermere Abbey, near WHITCHURCH, has sparked concerns about the loss of agricultural land.

planning application, photo of land and case study plus map

Two Shropshire solar farms could power 4,000 homes
Lightsource Renewable Energy has drawn up provisional designs for the solar farms, one near WHITCHURCH, the other close to the village of Burlton.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School