Page views this IP this session = 1 of 10 unsubscribed pagesHill of Easterton Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Hill of Easterton Wind Farm and local projects displayed.
( Subscribe for Β£100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for Β£500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Hill of Easterton Wind Farm (Wind , Active) Location in the UK : Scotland, Aberdeenshire Type of installation: Wind on/offshore: on Turbines :3 Capacity : 2.5 MW Approx Date of 1st power generation: July 2007
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Mackies Dairy
Ice cream manufacturers Mackie's of Scotland have their own energy supply - three Vestas V52 wind turbines - referred to as "Mackie's", "Ice" and "Cream". Each of these graceful machines have a 45 metre turbine and three 25 metre blades on the turning propeller and capacity to produce 850KW of power - so a total capacity at the farm of 2.5 MW.
Wind turbines are not a new sight on the farm, Mac's father Maitland previously installed a smaller turbine which powered the business's former piggery unit until 1997. That was one of the first grid connected wind turbines in the UK but did not have a very large output. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Mackies Hill of Easterton Wind Turbine - D Hill of Easterton Scotland
Relationship |
Company (For:
Hill of Easterton
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Hill of Easterton Extension 2 2.3 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Aberdeenshire Council
|
Site ID and Reference: |
3812 / AA420
District:
|
Applicant: |
Mackies Limited
Application :
APP/2011/2120
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
2.3 |
Site Address: |
Hill of Easterton, 1km North Of Mackies Ice Cream Dairy, Westertown, Rothienorman, Inverurie, AB51 8US
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
375650 / 375650
|
Development Status: |
Planning Permission Refused
|
Application Submitted: |
6/15/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
12/24/2012
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
1/25/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
12/24/2012 |
Site Name: |
Hill of Easterton Extension 2 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Aberdeenshire Council
|
Site ID and Reference: |
4056 / N00419W
District:
|
Applicant: |
Mackies
Application :
APP/2005/3308
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
1 |
Height of Turbines: |
|
Calculated capacity: |
2 |
Site Address: |
Hill of Easterton, 1km North Of Mackies Ice Cream Dairy, Westertown, Rothienorman, Inverurie, AB51 8US
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
376449 / 376449
|
Development Status: |
Operational
|
Application Submitted: |
9/28/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
7/31/2007
|
This Record Last Updated: |
10/8/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Hill of Easterton 2.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Aberdeenshire Council
|
Site ID and Reference: |
3532 / EN00082
District:
|
Applicant: |
Mackies
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
2.5 |
Site Address: |
Hill of Easterton, 1km North Of Mackies Ice Cream Dairy, Westertown, Rothienorman, Inverurie, AB51 8US
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
376449 / 376449
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
1/1/2005
|
This Record Last Updated: |
10/1/2009
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Mackies Hill of Easterton Wind Turbine - D
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00054SQSC
|
Capacity: |
2550
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
1/1/2005
|
|
|
Applicant: |
Mackies Limited
|
Applicant Address: |
Mackies Of Scotland
Westertown
Rothienorman
Inverurie
AB51 8US
Scotland
|
Address: |
Mackies Hill of Easterton Wind Turbine - D
Hill of EastertonScotland
Scotland
|
Site Name: |
Mackies Hill of Easterton Wind Turbine - D
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00267NWSC
|
Capacity: |
2550
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
1/1/2005
|
|
|
Applicant: |
Mackies Limited
|
Applicant Address: |
Mackies Of Scotland
Westertown
Rothienorman
Inverurie
AB51 8US
Scotland
|
Address: |
Mackies Hill of Easterton Wind Turbine - D
Hill of EastertonScotland
Scotland
|
|
Assumptions: Capacity: 2550kW 2.55 MW, Thus over the month Capacity * 720 hours per month = 1836 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/05/2018 | | | 468 | 18.35% | Issued | 01/04/2018 | | | 222 | 8.71% | Issued | 01/04/2018 | | | 152 | 5.96% | Issued | 01/03/2018 | | | 218 | 8.55% | Issued | 01/02/2018 | | | 270 | 10.59% | Issued | 01/01/2018 | | | 233 | 9.14% | Issued | 01/12/2017 | | | 247 | 9.69% | Issued | 01/11/2017 | | | 519 | 20.35% | Issued | 01/11/2017 | | | 256 | 10.04% | Issued | 01/10/2017 | | | 489 | 19.18% | Issued | 01/10/2017 | | | 248 | 9.73% | Issued | 01/09/2017 | | | 354 | 13.88% | Issued | 01/09/2017 | | | 233 | 9.14% | Issued | 01/08/2017 | | | 194 | 7.61% | Issued | 01/08/2017 | | | 158 | 6.20% | Issued | 01/07/2017 | | | 184 | 7.22% | Issued | 01/07/2017 | | | 198 | 7.76% | Issued | 01/06/2017 | | | 258 | 10.12% | Issued | 01/06/2017 | | | 220 | 8.63% | Issued | 01/05/2017 | | | 216 | 8.47% | Issued | 01/05/2017 | | | 217 | 8.51% | Issued | 01/04/2017 | | | 380 | 14.90% | Issued | 01/04/2017 | | | 304 | 11.92% | Issued | 01/03/2017 | | | 486 | 19.06% | Redeemed | 01/02/2017 | | | 768 | 30.12% | Redeemed | 01/01/2017 | | | 725 | 28.43% | Redeemed | Dec-16 | 0 | 662 | 662 | 25.96% | Issued | Nov-16 | 0 | 537 | 537 | 21.06% | Issued | Oct-16 | 0 | 493 | 493 | 19.33% | Issued | Oct-16 | 0 | 0 | 493 | 19.33% | Issued | Sep-16 | 0 | 511 | 511 | 20.04% | Issued | Aug-16 | 0 | 459 | 459 | 18.00% | Issued | Jul-16 | 0 | 200 | 202 | 7.92% | Issued | Jul-16 | 0 | 200 | 202 | 7.92% | Issued | Jun-16 | 0 | 455 | 455 | 17.84% | Issued | May-16 | 0 | 562 | 562 | 22.04% | Issued | Apr-16 | 0 | 538 | 538 | 21.10% | Issued | Feb-16 | 0 | 670 | 670 | 26.27% | Redeemed | Jan-16 | 0 | 886 | 886 | 34.75% | Redeemed | Dec-15 | 0 | 960 | 960 | 37.65% | Redeemed | Nov-15 | 0 | 629 | 629 | 24.67% | Redeemed | Oct-15 | 0 | 450 | 453 | 17.76% | Redeemed | Sep-15 | 0 | 563 | 563 | 22.08% | Redeemed | Aug-15 | 0 | 537 | 537 | 21.06% | Redeemed | Jul-15 | 451 | 453 | 453 | 17.76% | Redeemed | Jun-15 | 403 | 404 | 404 | 15.84% | Redeemed | May-15 | 603 | 604 | 604 | 23.69% | Redeemed | Apr-15 | 434 | 434 | 437 | 17.14% | Redeemed | Mar-15 | 603 | 605 | 605 | 23.73% | Redeemed | Feb-15 | 742 | 743 | 743 | 29.14% | Redeemed | Jan-15 | 965 | 966 | 966 | 37.88% | Redeemed | Dec-14 | 768 | 768 | 768 | 30.12% | Redeemed | Nov-14 | 572 | 574 | 574 | 22.51% | Redeemed | Oct-14 | 723 | 724 | 724 | 28.39% | Redeemed | Sep-14 | 283 | 283 | 285 | 11.18% | Redeemed | Aug-14 | 533 | 535 | 535 | 20.98% | Redeemed | Jul-14 | 295 | 296 | 299 | 11.73% | Redeemed | Jun-14 | 248 | 248 | 250 | 9.80% | Redeemed | May-14 | 301 | 302 | 303 | 11.88% | Redeemed | Apr-14 | 431 | 431 | 431 | 16.90% | Redeemed | Mar-14 | 606 | 608 | 608 | 23.84% | Redeemed | Feb-14 | 863 | 863 | 863 | 33.84% | Expired | Jan-14 | 932 | 933 | 933 | 36.59% | Redeemed | Dec-13 | 923 | 924 | 924 | 36.24% | Redeemed | Nov-13 | 618 | 618 | 618 | 24.24% | Redeemed | Oct-13 | 689 | 690 | 689 | 27.02% | Redeemed | Sep-13 | 553 | 555 | 555 | 21.76% | Redeemed | Aug-13 | 349 | 349 | 352 | 13.80% | Redeemed | Jul-13 | 233 | 233 | 236 | 9.25% | Redeemed | Jun-13 | 277 | 277 | 280 | 10.98% | Redeemed | May-13 | 738 | 739 | 739 | 28.98% | Redeemed | Apr-13 | 621 | 623 | 623 | 24.43% | Redeemed | Mar-13 | 599 | 600 | 600 | 23.53% | Redeemed | Feb-13 | 519 | 521 | 521 | 20.43% | Redeemed | Jan-13 | 481 | 482 | 482 | 18.90% | Redeemed | Dec-12 | 791 | 792 | 792 | 31.06% | Redeemed | Nov-12 | 578 | 579 | 579 | 22.71% | Redeemed | Oct-12 | 373 | 375 | 375 | 14.71% | Redeemed | Sep-12 | 547 | 549 | 549 | 21.53% | Redeemed | Aug-12 | 396 | 396 | 398 | 15.61% | Redeemed | Jul-12 | 341 | 341 | 342 | 13.41% | Redeemed | Jun-12 | 396 | 398 | 398 | 15.61% | Redeemed | May-12 | 341 | 341 | 343 | 13.45% | Redeemed | Apr-12 | 491 | 493 | 493 | 19.33% | Redeemed | Mar-12 | 546 | 548 | 548 | 21.49% | Redeemed | Feb-12 | 723 | 724 | 724 | 28.39% | Redeemed | Jan-12 | 840 | 841 | 841 | 32.98% | Redeemed | Dec-11 | 786 | 787 | 787 | 30.86% | Redeemed | Nov-11 | 816 | 816 | 816 | 32.00% | Redeemed | Oct-11 | 826 | 826 | 826 | 32.39% | Redeemed | Sep-11 | 678 | 680 | 680 | 26.67% | Redeemed | Aug-11 | 403 | 402 | 405 | 15.88% | Redeemed | Jul-11 | 458 | 460 | 460 | 18.04% | Redeemed | Jun-11 | 319 | 319 | 321 | 12.59% | Redeemed | May-11 | 646 | 647 | 647 | 25.37% | Redeemed | Apr-11 | 408 | 410 | 410 | 16.08% | Redeemed | Mar-11 | 535 | 535 | 535 | 20.98% | Redeemed | Feb-11 | 743 | 745 | 745 | 29.22% | Redeemed | Jan-11 | 448 | 448 | 448 | 17.57% | Redeemed | Dec-10 | 553 | 555 | 555 | 21.76% | Redeemed | Nov-10 | 679 | 680 | 680 | 26.67% | Redeemed |
|
Capacity: 5.1 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 12 m/s (26.844 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/20/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 South Wests first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|