Sorry I found no matches, Please try again.
Culmhead Solar Farm Sorry I found no matches, Please try again.
vid = 2116pws_id = 354113pws_id = 354113 Sorry I found no matches, Please try again.

--------------------------------------------------------
Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.238.252.196YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Culmhead Solar Farm

Subscribers see an interactive map with Culmhead Solar Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Solar projects and details.


Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm


Subscribe for £500 to include full csv and KML downloads of all Solar project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Culmhead Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, Churchstanton, Taunton, Somerset    
Type of installation: Solar    on/offshore: on
Solar Panels :23000  Capacity : 7 MW
Acreage:30   or approx Hectares : 12
Approx Date of 1st power generation: Jan 2014

/YES

 Comment

aka Blackdown

(2013)The(12.5 hectares)field scale project at Culmhead Aerodrome has recently been granted planning permission, despite the twin challenges of being located in an AONB (Area of Outstanding Natural Beauty), and close to a Scheduled Monument. Very few sites within AONBs are suitable for solar. Sensitive design and a high quality planning application were crucial to the success of the application.
Will provide a 25 year fund for social, economic and environmental benefits within the local community.

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Culmhead DECC Reference:C0132

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Culmhead : Solar OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register
Project Info
CULMHEAD Aerodrome has been granted planning permission blackdown

Planning Application blackdown CULMHEAD

Turbines planned for CULMHEAD
Dec 2013. A PLANNING application has been submitted to Taunton Deane Council for two 11kw wind turbines, with a tip height of nearly 25 metres, on agricultural land at Leigh Hill Farm, CULMHEAD (aka Blackdown).

April 21, 2012 - A planning application for a 5 Mega Watt solar array, CULMHEAD
CULMHEAD Renewable Energy /Blackdown Solar Power Ltd (set up specifically to make this application?). Mr Beath,Director of both companies, and of a third company, called CULMHEAD Wind Power which has not yet undertaken any activities at CULMHEAD.

October 19, 2012 - CULMHEAD 5MW Solar Array Approved by Taunton Deane BC
despite objections from local residents and the Blackdown Hills AONB Partnership. It seems that TDBC consider a 5MW powerstation covering 50 acres, in an AONB [suitable] etc

©2018 Simon Mallett
Latest News Added
Light or blight? Anger rises at plan for Britains biggest solar farm
A proposed new 600m solar farm in eastern England covering an area eight times bigger than Hyde Park in central London faces opposition over claims it would be a blight on the countryside.
Source: Guardian, Date and Time of entry: 06 August 2022 00:00

solar farm for Goshall Valley, in Ash near Sandwich
Villagers have now set up a website to combat the proposed development, which would go on 180.75 acres (73.15 hectares) of farming fields.
Source: kentonline, Date and Time of entry: 15 July 2022 00:00

Wind farm work for Scottish and English sites
180 blades for offshore turbines are to be manufactured in Hull for a wind farm project in Scotland's Moray Firth The turbines will later be pre-assembled at the Highland port of Nigg before installation at the Moray West site
Source: bbc, Date and Time of entry: 24 June 2022 00:00

Siemens Gamesa bags firm turbine order for 882-MW Moray West
June 23 (Renewables Now) - Siemens Gamesa Renewable Energy SA (BME:SGRE) has secured a firm order to supply 882 MW of turbines for the Moray West offshore wind project off Scotland, the company said.
Date and Time of entry: 24 June 2022 00:00

RenewableUK says global offshore wind grows to 846 GW
The figure includes projects at any stages of development, from operational to planned, as well as 135 GW of overlapping proposed projects, mainly in Brazil, Taiwan and Sweden.
Source: renewablesnow, Date and Time of entry: 24 June 2022 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School