Loading
Page views this IP this session = 1 of 10 unsubscribed pagesEdinbane Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Edinbane Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Edinbane Wind Farm (Wind , Active) Location in the UK : Scotland, Skye Type of installation: Wind on/offshore: on Turbines :18 Capacity : 41.4 MW Approx Date of 1st power generation: June 2010
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
•The Edinbane wind farm consists of 18 Enercon 2.3 MW wind turbines, with a maximum tip height of 100 metres.
•The substation has been constructed on site by Scottish and Southern Energy.
•Preliminary construction commenced in early 2008, whilst main site works commenced during August 2008.
•Wind turbines started to arrive during late summer 2009 and construction completed during June 2010.
•Vattenfall expects this 41.4 MW development to generate more than 128 gigawatt hours of green electricity every year.
For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Edinbane Wind Farm Glen Vic Askil Struan IV56 8FH
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Edinbane Wind Farm 41.4 MW
|
Energy Type: |
Wind Onshore |
County: |
Highland Country: Scotland LPA: Highland Council
|
Site ID and Reference: |
4674 / A0004
District:
|
Applicant: |
Vattenfall
Application :
02/00089/FULSL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
18 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
41.4 |
Site Address: |
Cruachan Brinn Mhicaskill, Edinbane, Portree, Highlands
|
|
IV51 9PW
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
134353 / 134353
|
Development Status: |
Operational
|
Application Submitted: |
2/28/2002
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
8/1/2008
|
|
|
Generator Live |
6/21/2010
|
This Record Last Updated: |
12/2/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 82.7999999999999 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 31 m/s (69.347 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/18/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|