Loading
Page views this IP this session = 1 of 10 unsubscribed pagesGlapwell Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Glapwell Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Glapwell Wind Farm (Wind , Proposed) Location in the UK : Wales, Bolsover Type of installation: Wind on/offshore: on Turbines :3 Capacity : 7.5 MW Approx Date of 1st power generation:
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Losk Lane Wind Farm Ltd, covers a total area of 40.4 ha and is largely open arable agricultural land (grade 2). The application is for the erection of 3 wind turbines for a period of 25 years with a maximum height of 125m to rotor tip, a hub height of approximately 80m, and a rotor diameter up to 92m. The turbines would be a three blade horizontal axis design.
The wind farm has the potential to generate up to 7.5MW of electricity (based on 2.5MW turbines) which, the applicant says, is enough electricity for about 4000 homes, the equivalent of approximately 14% of households within Bolsover District. There are a range of heritage assets within the area which have the potential to be affected (to varying degrees) by the proposed wind farm including Bolsover Castle, Hardwick Hall, Church of St John the Baptist and various conservation areas. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register
Relationship |
Company (For:
Glapwell
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|