Page views this IP this session = 1 of 10 unsubscribed pagesRampion Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Rampion Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Rampion Wind Farm (Wind , Active) Location in the UK : England, Offshore Brighton, Sussex Type of installation: Wind on/offshore: off Turbines :116 Capacity : 400 MW Approx Date of 1st power generation: November 2018
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The Rampion wind farm will be made up of 116 turbines which together could provide up to 400 MW of electricity - enough power for 250,000 households.
100 to 175 turbines, depending on the turbine size selected. For larger turbines, the number of turbines needed to generate the maximum output of 700MW would vary, e.g. 140 x5MW or 116 x 6MW turbines. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Offshore Brighton, Sussex
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Rampion Offshore Wind Farm (Hastings Zone) 400 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: The Planning Inspectorate - National Infrastructure
|
Site ID and Reference: |
2520 / A0251
District:
|
Applicant: |
E.ON UK
Application :
EN010032
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
116 |
Turbine Capacity: |
3.4500000000000002 |
Height of Turbines: |
140 |
Calculated capacity: |
400.2 |
Site Address: |
off the Sussex coastline
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
528790 / 528790
|
Development Status: |
Operational
|
Application Submitted: |
3/25/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/25/2016
|
|
|
Generator Live |
11/26/2017
|
This Record Last Updated: |
12/6/2019
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 800.400000000003 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/23/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|