Sorry I found no matches, Please try again. 176
vid = 1878pws_id = 351166pws_id = 351166
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.143.17.127 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Upper Holton Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Upper Holton Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Upper Holton Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, upper holton    
Type of installation: Wind    on/offshore: on
Turbines :5  Capacity : 10 MW
Approx Date of 1st power generation: February 2016

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Construction has started 12-May-2015

Engena provided the initial site design and co-ordinated and undertook the Environmental Impact Assessment, producing the subsequent Environmental Statement.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Upper Holton Halesworth IP19 8NH England

 Associated Companies.

Relationship Company (For: Upper Holton )
ConsultantEngena
DeveloperNatural Power
FinanceTemporis Capital LLP

 DECC Data on this Project: Upper Holton :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Upper Holton Wind Farm     11.5 MW
Energy Type: Wind Onshore
County: Suffolk     Country: England     LPA: Waveney District Council
Site ID and Reference: 4097 / B1000     District:
Applicant: Temporis Capital     Application : DC/13/0014/DRC (Go to search to find Application)
For Wind Farms  
Number of Turbines: 5 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 11.5
Site Address: Wind Farm, Upper Holton, Holton, Suffolk
 
County: Suffolk Region: Eastern
OS Coordinates: 640495 / 640495
Development Status: Operational
Application Submitted: 1/7/2013 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 6/1/2014    
Generator Live 2/26/2016 This Record Last Updated: 3/4/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 2/12/2018    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Upper Holton: Wind :

Site Name: Upper Holton Halesworth
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00385RQEN
Capacity: 10000 Status: Live
Accreditation Date: 1/7/2013    
Commission Date: 8/13/2015    
Applicant: Temporis Capital LLP
Applicant Address: Temporis Capital LLP Berger House 36-38 London W1J 5AE England
Address: Upper Holton Wind Farm Land at Former Airfield Upper Holton Halesworth IP19 8NH England

Site Name: Upper Holton Halesworth
Generator Type: Wind
Scheme : REGO Generator ID: G02796NWEN
Capacity: 10000 Status: Live
Accreditation Date: 1/7/2013    
Commission Date: 8/13/2015    
Applicant: Temporis Capital LLP
Applicant Address: Temporis Capital LLP Berger House 36-38 London W1J 5AE England
Address: Upper Holton Wind Farm Land at Former Airfield Upper Holton Halesworth IP19 8NH England
 
Assumptions: Capacity: 10000kW 10 MW,
Thus over the month Capacity * 720 hours per month = 7200 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/05/2018 1135 11.35% Issued
01/04/2018 1385 13.85% Issued
01/03/2018 1702 17.02% Issued
01/02/2018 1863 18.63% Issued
01/01/2018 2725 27.25% Issued
01/12/2017 2509 25.09% Issued
01/11/2017 1933 19.33% Issued
01/10/2017 2317 23.17% Issued
01/09/2017 1228 12.28% Issued
01/08/2017 1024 10.24% Issued
01/07/2017 1070 10.70% Issued
01/06/2017 1434 14.34% Issued
01/05/2017 1196 11.96% Issued
01/04/2017 1172 11.72% Issued
01/03/2017 1922 19.22% Redeemed
01/02/2017 1754 17.54% Redeemed
01/01/2017 1460 14.60% Redeemed
Dec-16 01313 1459 14.59% Issued
Nov-16 01525 1694 16.94% Issued
Oct-16 01041 1156 11.56% Issued
Oct-16 00 1156 11.56% Pending Tr
Sep-16 0965 1072 10.72% Issued
Aug-16 01123 1248 12.48% Issued
Jul-16 0808 902 9.02% Issued
Jul-16 0808 902 9.02% Issued
Jun-16 0798 893 8.93% Issued
May-16 01208 1342 13.42% Issued
Apr-16 01251 1390 13.90% Issued
Mar-16 01552 1724 17.24% Redeemed
Feb-16 02263 2514 25.14% Redeemed
Jan-16 02485 2761 27.61% Redeemed
Dec-15 02984 3316 33.16% Redeemed
Oct-15 0823 630 6.30% Redeemed
Sep-15 0836 929 9.29% Redeemed

 Calculations


Capacity: 20.4
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 16 m/s (35.792 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/25/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 20.4 start: 5 Optimum: 15/ Stop: 15.8 / wind: / ratio 351166

Project Info
Noise Assessment Report - Glendale Power

Engena: UPPER HOLTON Case Study

11363 UPPER HOLTON Wind Farm
Waveny District Council

Planning Application DC/13/0014/DRC, Wind Farm UPPER HOLTON
Installation of 5 wind turbines, with a maximum height to tip of 100m, a permanent meteorological mast, substation, access and tracks and associated infrastructure

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School