Loading
Page views this IP this session = 1 of 10 unsubscribed pagesSlieve Divena Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Slieve Divena Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Slieve Divena Wind Farm (Wind , Active) Location in the UK : N.Ireland, Garvaghy in County Tyrone Type of installation: Wind on/offshore: on Turbines :20 Capacity : 48.8 MW Approx Date of 1st power generation: March 2009
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Slieve Divena wind farm, Tyrone, Northern Ireland has an installed capacity of 30MW and was acquired by Infinis from Scottish and Southern Energy plc in April 2011. It has been generating since March 2009 and has a 14 year power purchase agreement.
Slieve Divena Phase II was granted planning consent in 2007 and will be an eight turbine, 20MW (megawatt) extension to SSE's existing 30MW Slieve Divena wind farm. Slieve Divena 2 Wind Farm Feb 2017 8 Turbines added An extension to Proposed Slieve Divena Phase 1 Wind Farm (Planning ref K/2005/ 0597/F) involving an additional 8 wind turbines each with a maximum overall height of 101m, associated transformers, a permanent anemometer mast, site access tracks, upgrading of existing access tracks, a site control room and substation (enlarged), temporary site compound, electrical cabling, road improvement works at the junction of the Radergan Road and Shantavny Road and all ancillary works For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Subscribed version includes full address details of project site Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects) Subscriber Register Subscribed version includes access to DECC data where it exists for this project. Also facility to include a mix of DECC data within csv downloads Subscriber Register Subscribed version includes access to OFGEM data where it exists for this project. Also facility to include a mix of OFGEM data within csv downloads Subscriber Register
Capacity: 48.8 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 20/08/2022 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Edinburgh Airport's plan to build solar farm an eleven-acre solar farm is set to be constructed on our airfield. Work will get underway later this year, and the project is forecast to be completed in March 2023. Source: edinburgh airport, Date and Time of entry: 19 August 2022 00:00
Studley Solar Farm Enso Energy is proposing to develop a solar farm and battery
storage facility on land adjacent to Studley Farm, Atworth,
Melksham. Source: enso, Date and Time of entry: 19 August 2022 00:00
Aldenham Another planning application has been lodged for the solar farm. Please look at the new plans and make your comments to Hertsmere Planning Dept. Solar Farm – 22/0948/FULEI Source: aldenham pc, Date and Time of entry: 19 August 2022 00:00
Aldenham Aldenham Estate owner on why she wants to see solar farm on her land Source: watfordobserver, Date and Time of entry: 19 August 2022 00:00
Proposal for a new solar energy & battery storage farm We submitted an application for a Development Consent Order (DCO) for Longfield Solar Farm to the Planning Inspectorate (PINS) on 28 February 2022. This was accepted for Examination on 28 March 2022. Source: longfield, Date and Time of entry: 19 August 2022 00:00
|
|
©2017
Simon Mallett |
|