Sorry I found no matches, Please try again.
Lynemouth Wind Farm Sorry I found no matches, Please try again.
vid = 1849pws_id = 322040pws_id = 322040
--------------------------------------------------------
Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.204.56.185YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Lynemouth Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Lynemouth Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Lynemouth Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Northumberland, Wansbeck    
Type of installation: Wind    on/offshore: on
Turbines :13  Capacity : 26 MW
Approx Date of 1st power generation: February 2012

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Construction on the site began in October 2010 and the turbine installer Windhoist completed the mechanical and electrical installation of the 13 wind turbines in December 2011.

Located approx 2km north of Ashington, Northumberland, adjacent to the Rio Tinto Alcan Lynemouth Smelter, the windfarm will comprise of up to 13 turbines with the capacity to produce 30MW of clean green energy, enough to power over 16,000 homes.

The turbines will stand at 121m (397ft). The nearby smelter chimneys are 80m (262ft) in height while the Alcan power station stack is 114m (374ft) high.

Construction started October 2010, Turbine deliveries to site will commence in summer 2011

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Lynemouth DECC Reference:N00361W

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Lynemouth : Wind OFGEM Reference:R00265RQEN

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 50
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 22 m/s (49.214 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 13/08/2022
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 50 start: 5 Optimum: 15/ Stop: 22 / wind: / ratio 322040

Project Info
Giant wind turbines are approved

Planning Approval For LYNEMOUTH Windfarm in Northumberland

Scottish Power

NECC Supports LYNEMOUTH Power Station Licence Exemption
NECC has written to the Department of Energy and Climate Change in support of the Secretary of States proposal to grant a licence exemption to the proposed new owners of the LYNEMOUTH Power Station.

17ft hedge would hide turbine views - Fenrother
The Energiekontor submission accepts that Moor Edge House would have direct views of the turbines, as well as existing ones at LYNEMOUTH and Bewick Drift,

©2018 Simon Mallett
Latest News Added
Light or blight? Anger rises at plan for Britains biggest solar farm
A proposed new 600m solar farm in eastern England covering an area eight times bigger than Hyde Park in central London faces opposition over claims it would be a blight on the countryside.
Source: Guardian, Date and Time of entry: 06 August 2022 00:00

solar farm for Goshall Valley, in Ash near Sandwich
Villagers have now set up a website to combat the proposed development, which would go on 180.75 acres (73.15 hectares) of farming fields.
Source: kentonline, Date and Time of entry: 15 July 2022 00:00

Wind farm work for Scottish and English sites
180 blades for offshore turbines are to be manufactured in Hull for a wind farm project in Scotland's Moray Firth The turbines will later be pre-assembled at the Highland port of Nigg before installation at the Moray West site
Source: bbc, Date and Time of entry: 24 June 2022 00:00

Siemens Gamesa bags firm turbine order for 882-MW Moray West
June 23 (Renewables Now) - Siemens Gamesa Renewable Energy SA (BME:SGRE) has secured a firm order to supply 882 MW of turbines for the Moray West offshore wind project off Scotland, the company said.
Date and Time of entry: 24 June 2022 00:00

RenewableUK says global offshore wind grows to 846 GW
The figure includes projects at any stages of development, from operational to planned, as well as 135 GW of overlapping proposed projects, mainly in Brazil, Taiwan and Sweden.
Source: renewablesnow, Date and Time of entry: 24 June 2022 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School