Burnfoot Hill Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Burnfoot Hill Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Burnfoot Hill Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Glen Eagles Stirlingshire    
Type of installation: Wind    on/offshore: on
Turbines :13  Capacity : 26 MW
Approx Date of 1st power generation: 2010

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Includes Rhoders Hill Wind Farm which is an extension to Burnfoot

The Burnfoot Hill Wind Farm consists of thirteen 2MW wind turbines, each with 60m high towers and blades that are 42m long, giving an overall maximum height of 102m, and associated infrastructure including internal access tracks, crane hardstandings, a switchgear building, a permanent anemometer mast and potentially two borrow pits.

Proposed Extension
A maximum of 22 turbines (up to 44MW) are being considered as an extension, using the same scale of turbines as that currently installed at Burnfoot Hill

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Rhodders FarmAlva FK12 5JY Scotland

 Associated Companies.

Relationship Company (For: Burnfoot Hill )
OwnerEDF Energy Renewables
OperatorEDF Energy Renewables
DeveloperWind Prospect

 DECC Data on this Project: Burnfoot Hill :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Burnfoot East Wind Farm (further extension)     10.8 MW
Energy Type: Wind Onshore
County: Clackmannanshire     Country: Scotland     LPA: Clackmannanshire Council
Site ID and Reference: 6324 /     District:
Applicant: Wind Prospect Developments     Application : 17/00026/FULL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 3.6000000000000001
Height of Turbines: 135 Calculated capacity: 10.8
Site Address: Site West Of Burnfoot Hill, High Street, Tillicoultry, Central
  FK13 6A
County: Clackmannanshire Region: Scotland
OS Coordinates: 290930 / 290930
Development Status: Under Construction
Application Submitted: 1/30/2017 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 9/1/2019    
Generator Live This Record Last Updated: 9/21/2020
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Burnfoot Hill Extension     4 MW
Energy Type: Wind Onshore
County: Tayside     Country: Scotland     LPA: Perth & Kinross Council
Site ID and Reference: 4450 / AA629     District:
Applicant: Private Developer     Application : 11/01930/FLL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 4
Site Address: Site South Of The Upper And Lower Glendevon Resevoirs Glendevon
 
County: Tayside Region: Scotland
OS Coordinates: 290393 / 290393
Development Status: Operational
Application Submitted: 12/9/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 9/9/2014 This Record Last Updated: 9/11/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Rhodders Wind Farm     12 MW
Energy Type: Wind Onshore
County: Clackmannanshire     Country: Scotland     LPA: Clackmannanshire Council
Site ID and Reference: 4223 / B0255     District:
Applicant: EDF/Wind Prospect     Application : 11/00299/FULL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 6 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 12
Site Address: Site West Of Burnfoot Hill Tillicoultry Clackmannanshire
  FK13 6A
County: Clackmannanshire Region: Scotland
OS Coordinates: 289525 / 289525
Development Status: Operational
Application Submitted: 11/7/2011 Planning Permission Granted
Application Determined: Permission refused: 7/8/2013
Construction Date: 8/1/2015    
Generator Live 2/29/2016 This Record Last Updated: 2/29/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 7/8/2013

Site Name: Burnfoot Hill     26 MW
Energy Type: Wind Onshore
County: Clackmannanshire     Country: Scotland     LPA: Clackmannanshire Council
Site ID and Reference: 2902 / EN00034     District:
Applicant: EDF Energies Nouvelles     Application : 06/00121/FULL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 13 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 26
Site Address: Burnfoot Hill, Clackmannanshire
 
County: Clackmannanshire Region: Scotland
OS Coordinates: 290135 / 290135
Development Status: Operational
Application Submitted: 3/20/2006 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 8/1/2010    
Generator Live 10/26/2010 This Record Last Updated: 11/3/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Burnfoot Hill: Wind :

Site Name: Rhodders
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: R00295SQSC
Capacity: 12240 Status: Live
Accreditation Date: 3/20/2006    
Commission Date: 11/24/2015    
Applicant: BURNFOOT WINDFARM LIMITED
Applicant Address: 40 GROSVENOR PLACE LONDON SW1X 7EN England
Address: Rhodders Farm Alva FK12 5JY Scotland

Site Name: Rhodders
Generator Type: Wind
Scheme : REGO Generator ID: G02364NWSC
Capacity: 12240 Status: Live
Accreditation Date: 3/20/2006    
Commission Date: 11/24/2015    
Applicant: BURNFOOT WINDFARM LIMITED
Applicant Address: 40 GROSVENOR PLACE LONDON SW1X 7EN England
Address: Rhodders Farm Alva FK12 5JY Scotland
 
Assumptions: Capacity: 12240kW 12.24 MW,
Thus over the month Capacity * 720 hours per month = 8812.8 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 2651 21.66% Issued
01/02/2018 2498 20.41% Issued
01/01/2018 3191 26.07% Issued
01/12/2017 3002 24.53% Issued
01/11/2017 4242 34.66% Issued
01/10/2017 5437 44.42% Issued
01/09/2017 2798 22.86% Issued
01/08/2017 3177 25.96% Issued
01/07/2017 3106 25.38% Issued
01/06/2017 3677 30.04% Issued
01/05/2017 2122 17.34% Issued
01/04/2017 3988 32.58% Issued
01/03/2017 3857 31.51% Redeemed
01/02/2017 3932 32.12% Redeemed
01/01/2017 3937 32.17% Redeemed
Dec-16 04435 4927 40.25% Issued
Nov-16 02374 2637 21.54% Issued
Oct-16 02096 2329 19.03% Issued
Sep-16 03293 3659 29.89% Issued
Aug-16 02505 2784 22.75% Issued
Jul-16 02705 3005 24.55% Issued
Jun-16 01243 1391 11.36% Issued
May-16 02054 2282 18.64% Issued
Apr-16 02125 2361 19.29% Issued

 Calculations


Capacity: 160
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 21 m/s (46.977 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/19/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 160 start: 5 Optimum: 15/ Stop: 21.285714 / wind: / ratio 350930

Project Info
Rhodders Hill : Burnfoot Extension
The Rhodders Wind Farm, which has six new turbines in the Ochils, is the second extension to the originally existing 13 turbine BURNFOOT HILL Wind Farm, built in 2010.

BURNFOOT HILL Extension

BURNFOOT HILL Environmental Statement

Wind Prospect - BURNFOOT HILL

Report on BURNFOOT HILL Wind Farm Installation

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School