Sorry I found no matches, Please try again.
Dagenham Wind Farm Sorry I found no matches, Please try again.
vid = 164pws_id = 350413pws_id = 350413
--------------------------------------------------------
Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.208.126.232YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Dagenham Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Dagenham Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Dagenham Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Dagenham London    
Type of installation: Wind    on/offshore: on
Turbines :3  Capacity : 5.9 MW
Approx Date of 1st power generation: April 2004

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The two 85m high wind turbines, with a combined capacity of 3.6MW, will generate over 6.7million kWh of clean electricity every year, provide all the electricity needed to power Fords new Dagenham Clean Engine Facility.
An Additional Turbine 2.3 MW Enercon E82 - Dagenham II was added in Agust 2011

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Dagenham DECC Reference:N00124W

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Dagenham : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 5.6
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 20/08/2022
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 5.6 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350413

Project Info
Ecotricity

Ford News - 3rd turbine

Ford puts its money into wind power

DAGENHAM 'worst location for a wind turbine'
The most comprehensive report of its kind sought out to pinpoint the best locations in the UK for householders to install micro-wind turbines.

Ford adds third wind turbine to DAGENHAM plant
Ford’s latest venture into wind energy was completed last week, as the blades on its largest and most powerful wind turbine were lifted into place at its DAGENHAM plant.

©2018 Simon Mallett
Latest News Added
Edinburgh Airport's plan to build solar farm
an eleven-acre solar farm is set to be constructed on our airfield. Work will get underway later this year, and the project is forecast to be completed in March 2023.
Source: edinburgh airport, Date and Time of entry: 19 August 2022 00:00

Studley Solar Farm
Enso Energy is proposing to develop a solar farm and battery storage facility on land adjacent to Studley Farm, Atworth, Melksham.
Source: enso, Date and Time of entry: 19 August 2022 00:00

Aldenham
Another planning application has been lodged for the solar farm. Please look at the new plans and make your comments to Hertsmere Planning Dept. Solar Farm – 22/0948/FULEI
Source: aldenham pc, Date and Time of entry: 19 August 2022 00:00

Aldenham
Aldenham Estate owner on why she wants to see solar farm on her land
Source: watfordobserver, Date and Time of entry: 19 August 2022 00:00

Proposal for a new solar energy & battery storage farm
We submitted an application for a Development Consent Order (DCO) for Longfield Solar Farm to the Planning Inspectorate (PINS) on 28 February 2022. This was accepted for Examination on 28 March 2022.
Source: longfield, Date and Time of entry: 19 August 2022 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School