Loading
Page views this IP this session = 1 of 10 unsubscribed pagesFallago Rig Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Fallago Rig Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Fallago Rig Wind Farm (Wind , Active) Location in the UK : Scotland, Scottish Borders Type of installation: Wind on/offshore: on Turbines :48 Capacity : 144 MW Approx Date of 1st power generation: July 2013
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
BT has agreed a £300m deal to buy enough energy to meet the needs of all its Scottish operations for the next 20 years from Fallago Rig Wind Farm
Fallago Rig Wind Farm is a 48 wind turbine project in the Scottish Borders, owned by EDF Energy Renewables.
Construction work was completed in July 2013 and the project is now under Operational Control.
Wind turbine installation works commenced mid July 2012.
(November 2010) Developers North British Wind Power gained approval of the site.
"The local community are represented through the Tweed Forum, and a Fallago Rig environmental fund has been set up which will provide £240,000 each year of operation for local environmental improvements and sustainable development projects."
(July 2009) MoD drops objection to Fallago Rig wind farm plan; Objectors call for second Public Inquiry. This follows discussions with the Scottish Government’s Renewable Energy Division and applicant North British Windpower who are now confident that they have addressed any fears the MoD had about the 48 turbine development posing a threat to national security.
Emailed Comment: As the location is in a fold in the hills, the turbines on Fallago Rig will only be visible to the blackface sheep grazing there, and the shepherds and gamekeepers working on the moor.
Construction will begin in 2011 and it should be generating renewable energy within the next two year For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register c/o EDF Energy Renewables Endeavour House Victory Way Doxford Business Park Sunderland SR3 3XL
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Fallago Rig 2 (extension) 41 MW
|
Energy Type: |
Wind Onshore |
County: |
Borders Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4964 /
District:
|
Applicant: |
EDF Energy Renewables
Application :
EC00003102
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
12 |
Turbine Capacity: |
3.4500000000000002 |
Height of Turbines: |
127 |
Calculated capacity: |
41.4 |
Site Address: |
Fallago Rig 2, Longformacus, Duns
|
|
TD11 3PB
|
County: |
Borders Region: Scotland
|
OS Coordinates: |
369234 / 369234
|
Development Status: |
Appeal Refused
|
Application Submitted: |
1/29/2016
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
6/25/2020
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
7/9/2020
|
RO Banding (ROC/MWh) |
0.9
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
12/21/2016 |
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
6/25/2020 |
Granted: |
|
Appeal Granted: |
6/25/2020 |
Site Name: |
Fallago Rig 144 MW
|
Energy Type: |
Wind Onshore |
County: |
Borders Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4059 / N00549W
District:
|
Applicant: |
EDF Energy Renewables
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
48 |
Turbine Capacity: |
3 |
Height of Turbines: |
|
Calculated capacity: |
144 |
Site Address: |
Lammermuir Hills
|
|
|
County: |
Borders Region: Scotland
|
OS Coordinates: |
357000 / 357000
|
Development Status: |
Operational
|
Application Submitted: |
5/16/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
6/6/2007
|
Construction Date: |
3/1/2011
|
|
|
Generator Live |
3/31/2013
|
This Record Last Updated: |
7/2/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
6/6/2007 |
Capacity: 288 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/25/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|