Sorry I found no matches, Please try again.
Crook Hill Wind Farm Sorry I found no matches, Please try again.
vid = 119pws_id = 353462pws_id = 353462
--------------------------------------------------------
Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.237.67.179YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Crook Hill Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Crook Hill Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Crook Hill Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Lancashire    
Type of installation: Wind    on/offshore: on
Turbines :12  Capacity : 36 MW
Approx Date of 1st power generation: 2012

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

After further examination of the site area, and in light of securing planning approval for 12 turbines, Coronation has chosen to submit two revised applications to the local planning authorities. Each application is identical in size and each takes account of the previous approvals but differ with regard to the proposed access routes to and from the site. These applications have now been submitted to the Local Planning Authority.

refused October 2008, revised plan with 12 turbines, approved June 2011

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Crook Hill DECC Reference:07036W5

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Crook Hill : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 36
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 28/11/2020
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 36 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 353462


Weather Station Name : Shaw Latitude: 53.5799 Longitude: -2.09 Elevation: 179

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
12/07/2018 09:00:00E 4 5 / 25 0
12/07/2018 12:00:00E 4 5 / 25 0
12/07/2018 15:00:00NE 2 5 / 25 0
12/07/2018 18:00:00NE 2 5 / 25 0
12/07/2018 21:00:00ENE 11 5 / 25 0
13/07/2018E 11 5 / 25 0
13/07/2018 03:00:00E 7 5 / 25 0
13/07/2018 06:00:00E 7 5 / 25 0
13/07/2018 09:00:00ESE 4 5 / 25 0
13/07/2018 12:00:00SSE 4 5 / 25 0
13/07/2018 15:00:00S 4 5 / 25 0
13/07/2018 18:00:00SSW 4 5 / 25 0
13/07/2018 21:00:00S 2 5 / 25 0
14/07/2018S 2 5 / 25 0
14/07/2018 03:00:00WNW 2 5 / 25 0
14/07/2018 06:00:00W 2 5 / 25 0
14/07/2018 09:00:00WSW 4 5 / 25 0
14/07/2018 12:00:00WSW 4 5 / 25 0
14/07/2018 15:00:00W 7 5 / 25 0
14/07/2018 18:00:00W 7 5 / 25 0
14/07/2018 21:00:00NNW 4 5 / 25 0
15/07/2018SSW 2 5 / 25 0
15/07/2018 03:00:00SSW 2 5 / 25 0
15/07/2018 06:00:00SSW 2 5 / 25 0
15/07/2018 09:00:00SW 4 5 / 25 0
15/07/2018 12:00:00SW 7 5 / 25 0
15/07/2018 15:00:00WSW 7 5 / 25 0
15/07/2018 18:00:00W 7 5 / 25 0
15/07/2018 21:00:00NW 4 5 / 25 0
16/07/2018NW 2 5 / 25 0
16/07/2018 03:00:00WSW 2 5 / 25 0
16/07/2018 06:00:00SSW 2 5 / 25 0
16/07/2018 09:00:00W 4 5 / 25 0
16/07/2018 12:00:00WSW 7 5 / 25 0
16/07/2018 15:00:00WNW 7 5 / 25 0
16/07/2018 18:00:00NW 7 5 / 25 0
16/07/2018 21:00:00NW 4 5 / 25 0
Project Info
CROOK HILL Wind Farm

Coronation Power: CROOK HILL Wind Farm

(2008) Councillors deal a blow to CROOK HILL wind turbines
Plans by Coronation Power to build four wind turbines on CROOK HILL received a blow last night (Wednesday 23 October) as Pennines Township Councillors recommended that the Council refuse the planning application.

©2018 Simon Mallett
Latest News Added
New 22-turbine Highlands wind farm to generate 9m a year in community benefits
The Scot-Govt. has given the planning go-ahead to construction of the 22 turbine Creag Riabhach farm on the Altnaharra Estate, near Lairg, in the North Highlands.
Source: scottishenergynews, Date and Time of entry: 26 November 2020 00:00

Planning Committee Report LA01/2018/1151/F
Proposed amendment to the overall tip height of the consented Evishagaran Wind Farm (B/2013/0120/F / 2014/A0169) to a maximum tip height of 140m;
Date and Time of entry: 26 November 2020 00:00

Turbines going up at 35m wind farm
INVERCLYDE'S skyline is changing as the first of eight massive wind turbines is installed in the hills above Greenock.
Source: greenocktelegraph, Date and Time of entry: 25 November 2020 00:00

MASSIVE Blades For Inverclyde Windfarm Turbines Start Arriving
THE first convoys carrying huge turbine blades for a windfarm being built in the hills near Greenock travelled to the area today (Tuesday). Two trucks escorted by police motorbikes travelled to the site from King George V Dock in Glasgow.
Date and Time of entry: 25 November 2020 00:00

The next frontier of wind power
A new report starkly sets out the shortcomings of Britain's role in the supply chain, while other countries surge ahead. It recommends government action to back the industry, and to counteract the risks from Brexit.
Source: bbc, Date and Time of entry: 25 November 2020 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School