Loading
Page views this IP this session = 1 of 10 unsubscribed pagesClyde Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Clyde Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Clyde Wind Farm (Wind , Active) Location in the UK : Scotland, South Lanarkshire Type of installation: Wind on/offshore: on Turbines :200 Capacity : 460 MW Approx Date of 1st power generation: December 2011
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Clyde South
Clyde Wind Farm: The £600m ($1.2bn) Clyde wind farm will have 152 turbines and total capacity of 456MW, enough to power more than 250,000 homes. It will be the largest wind farm in Europe when completed.
Turbines with a total capacity of 51MW (megawatts) have been energised at Clyde, which means that the first of the wind farm's three sections (South, 130MW in total) remains on course to be completed by the time of SSE's six-month financial results announcement in November. The remaining two sections (220MW in total) are on course to be completed in 2012.
Clyde South completed.
The detail view of the wind turbines is out by 6. I have identified 200 while there should be 206 with Central / North / South and Extension. The overall wind farm layout is accurate. Showing the wind farm with each turbine and adding capacity avoids the confusion which occurs when trying to identify individual stages and assigning a total for that and possibly including the previous stage as can be seen on many reports / summaries For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Clyde Windfarm (Central)Entrance E, B7076 Crawford to Beattock Road Elvanfoot Biggar ML12 6RL Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Clyde Wind Farm Extension (Clyde 2) 172.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4178 / AA509
District:
|
Applicant: |
Scottish and Southern Energy (SSE)/ GIB
Application :
EC00003160
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
54 |
Turbine Capacity: |
3.2000000000000002 |
Height of Turbines: |
|
Calculated capacity: |
172.8 |
Site Address: |
Upper Clyde Valley, surrounding Camps Reservoir
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
302328 / 302328
|
Development Status: |
Operational
|
Application Submitted: |
10/10/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
7/20/2015
|
|
|
Generator Live |
8/15/2017
|
This Record Last Updated: |
6/1/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Clyde Wind Farm 350 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4011 / N00139W
District:
|
Applicant: |
Scottish and Southern Energy (SSE)/ Greencoat UK Wind
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
152 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
349.6 |
Site Address: |
Clyde Wind farm, Lowther Hills, between Crawford and Nether Howecleuch,
NW of Lockerbie
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
302500 / 302500
|
Development Status: |
Operational
|
Application Submitted: |
10/1/2004
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
10/1/2012
|
This Record Last Updated: |
6/1/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Clyde Windfarm (North)
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00187SQSC
|
Capacity: |
192303
|
Status: |
Live
|
Accreditation Date: |
10/1/2004
|
|
|
Commission Date: |
6/1/2012
|
|
|
Applicant: |
Clyde Windfarm (Scotland) Limited
|
Applicant Address: |
Inveralmond House
200 Dunkeld Road
PERTH
PH1 3AQ
Scotland
|
Address: |
Clyde Windfarm (North)
Crawford
Biggar
ML12 6UB
Scotland
|
Site Name: |
Clyde Windfarm (North)
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01804NWSC
|
Capacity: |
192303
|
Status: |
Live
|
Accreditation Date: |
10/1/2004
|
|
|
Commission Date: |
6/1/2012
|
|
|
Applicant: |
Clyde Windfarm (Scotland) Limited
|
Applicant Address: |
Inveralmond House
200 Dunkeld Road
PERTH
PH1 3AQ
Scotland
|
Address: |
Clyde Windfarm (North)
Crawford
Biggar
ML12 6UB
Scotland
|
|
Assumptions: Capacity: 192303kW 192.303 MW, Thus over the month Capacity * 720 hours per month = 138458.16 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 59506 | 30.94% | Issued | 01/02/2018 | | | 52406 | 27.25% | Issued | 01/01/2018 | | | 68176 | 35.45% | Issued | 01/12/2017 | | | 48149 | 25.04% | Retired | 01/11/2017 | | | 49632 | 25.81% | Retired | 01/10/2017 | | | 54658 | 28.42% | Retired | 01/09/2017 | | | 42293 | 21.99% | Retired | 01/08/2017 | | | 30720 | 15.97% | Retired | 01/07/2017 | | | 32232 | 16.76% | Retired | 01/06/2017 | | | 34474 | 17.93% | Retired | 01/05/2017 | | | 28216 | 14.67% | Issued | 01/04/2017 | | | 41574 | 21.62% | Issued | 01/03/2017 | | | 41090 | 21.37% | Redeemed | 01/02/2017 | | | 42121 | 21.90% | Redeemed | 01/01/2017 | | | 36844 | 19.16% | Redeemed | Sep-16 | 0 | 27790 | 27790 | 14.45% | Retired | Aug-16 | 0 | 22191 | 22191 | 11.54% | Retired | Jul-16 | 0 | 22997 | 22997 | 11.96% | Retired | Jun-16 | 0 | 9250 | 9420 | 4.90% | Retired | Jun-16 | 0 | 9250 | 9420 | 4.90% | Issued | May-16 | 0 | 24544 | 24544 | 12.76% | Issued | Apr-16 | 0 | 23377 | 23377 | 12.16% | Issued | Mar-16 | 0 | 20326 | 20326 | 10.57% | Redeemed | Feb-16 | 0 | 29836 | 29836 | 15.52% | Redeemed | Jan-16 | 0 | 36065 | 36065 | 18.75% | Redeemed | Dec-15 | 0 | 40627 | 40627 | 21.13% | Retired | Nov-15 | 0 | 34134 | 34134 | 17.75% | Retired | Oct-15 | 0 | 21256 | 21256 | 11.05% | Retired | Sep-15 | 0 | 13675 | 13778 | 7.16% | Retired | Aug-15 | 0 | 21122 | 21122 | 10.98% | Retired | Jul-15 | 23961 | 23961 | 23961 | 12.46% | Redeemed | Jun-15 | 23365 | 23365 | 23365 | 12.15% | Redeemed | May-15 | | 35490 | 35490 | 18.46% | Redeemed | Apr-15 | 22268 | 22268 | 22268 | 11.58% | Redeemed | Mar-15 | | 35058 | 35058 | 18.23% | Redeemed | Feb-15 | 28724 | 28725 | 28725 | 14.94% | Redeemed | Jan-15 | | 38885 | 38885 | 20.22% | Redeemed | Dec-14 | | 34462 | 34462 | 17.92% | Redeemed | Nov-14 | 24241 | 24242 | 24242 | 12.61% | Redeemed | Oct-14 | 31114 | 31113 | 31113 | 16.18% | Redeemed | Sep-14 | 9961 | 9764 | 9961 | 5.18% | Redeemed | Aug-14 | 25944 | 25944 | 25944 | 13.49% | Redeemed | Jul-14 | 10866 | 10758 | 10866 | 5.65% | Redeemed | Jun-14 | 10979 | 10825 | 10979 | 5.71% | Redeemed | May-14 | 21849 | 21849 | 21849 | 11.36% | Redeemed | Apr-14 | 27702 | 27702 | 27702 | 14.41% | Redeemed | Mar-14 | 37171 | 37171 | 37171 | 19.33% | Redeemed | Feb-14 | 43309 | 43309 | 43309 | 22.52% | Redeemed | Jan-14 | 39521 | 39522 | 1 | 0.00% | Redeemed | Dec-13 | 49114 | 49114 | 1 | 0.00% | Redeemed | Nov-13 | 30316 | 30316 | 1 | 0.00% | Redeemed | Oct-13 | 42724 | 42725 | 1 | 0.00% | Redeemed | Sep-13 | 19287 | 19287 | 1 | 0.00% | Redeemed | Aug-13 | 16683 | 16683 | 16683 | 8.68% | Redeemed | Jul-13 | 10662 | 10661 | 10661 | 5.54% | Redeemed | Jun-13 | 14793 | 14794 | 14794 | 7.69% | Redeemed | May-13 | 31726 | 31726 | 31726 | 16.50% | Redeemed | Apr-13 | 24262 | 24262 | 24262 | 12.62% | Redeemed | Mar-13 | 31261 | 31260 | 31260 | 16.26% | Redeemed | Feb-13 | 24792 | 24792 | 24792 | 12.89% | Redeemed | Jan-13 | 35795 | 35795 | 35795 | 18.61% | Redeemed | Dec-12 | 32083 | 32083 | 32083 | 16.68% | Redeemed | Nov-12 | 30848 | 30848 | 30848 | 16.04% | Redeemed | Oct-12 | 17175 | 17175 | 17175 | 8.93% | Redeemed | Sep-12 | 26646 | 26646 | 26646 | 13.86% | Redeemed | Aug-12 | 10947 | 10948 | 10948 | 5.69% | Redeemed |
|
Capacity: 919.999999999994 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/24/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|