Sorry I found no matches, Please try again. 176
vid = 106pws_id = 355883pws_id = 355883
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.21.248.47 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Clyde Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Clyde Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Clyde Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, South Lanarkshire    
Type of installation: Wind    on/offshore: on
Turbines :200  Capacity : 460 MW
Approx Date of 1st power generation: December 2011

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Clyde South
Clyde Wind Farm: The £600m ($1.2bn) Clyde wind farm will have 152 turbines and total capacity of 456MW, enough to power more than 250,000 homes. It will be the largest wind farm in Europe when completed.
Turbines with a total capacity of 51MW (megawatts) have been energised at Clyde, which means that the first of the wind farm's three sections (South, 130MW in total) remains on course to be completed by the time of SSE's six-month financial results announcement in November. The remaining two sections (220MW in total) are on course to be completed in 2012.
Clyde South completed.

The detail view of the wind turbines is out by 6. I have identified 200 while there should be 206 with Central / North / South and Extension. The overall wind farm layout is accurate. Showing the wind farm with each turbine and adding capacity avoids the confusion which occurs when trying to identify individual stages and assigning a total for that and possibly including the previous stage as can be seen on many reports / summaries

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Clyde Windfarm (Central)Entrance E, B7076 Crawford to Beattock Road Elvanfoot Biggar ML12 6RL Scotland

 Associated Companies.

Relationship Company (For: Clyde )
InstallerBlackwell Group
InstallerFairhurst
ConsultantLand Use Consultants

 DECC Data on this Project: Clyde :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Clyde Wind Farm Extension (Clyde 2)     172.8 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 4178 / AA509     District:
Applicant: Scottish and Southern Energy (SSE)/ GIB     Application : EC00003160 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 54 Turbine Capacity: 3.2000000000000002
Height of Turbines: Calculated capacity: 172.8
Site Address: Upper Clyde Valley, surrounding Camps Reservoir
 
County: Strathclyde Region: Scotland
OS Coordinates: 302328 / 302328
Development Status: Operational
Application Submitted: 10/10/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 7/20/2015    
Generator Live 8/15/2017 This Record Last Updated: 6/1/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Clyde Wind Farm     350 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 4011 / N00139W     District:
Applicant: Scottish and Southern Energy (SSE)/ Greencoat UK Wind     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 152 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 349.6
Site Address: Clyde Wind farm, Lowther Hills, between Crawford and Nether Howecleuch, NW of Lockerbie
 
County: Strathclyde Region: Scotland
OS Coordinates: 302500 / 302500
Development Status: Operational
Application Submitted: 10/1/2004 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 10/1/2012 This Record Last Updated: 6/1/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Clyde: Wind :

Site Name: Clyde Windfarm (North)
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: R00187SQSC
Capacity: 192303 Status: Live
Accreditation Date: 10/1/2004    
Commission Date: 6/1/2012    
Applicant: Clyde Windfarm (Scotland) Limited
Applicant Address: Inveralmond House 200 Dunkeld Road PERTH PH1 3AQ Scotland
Address: Clyde Windfarm (North) Crawford Biggar ML12 6UB Scotland

Site Name: Clyde Windfarm (North)
Generator Type: Wind
Scheme : REGO Generator ID: G01804NWSC
Capacity: 192303 Status: Live
Accreditation Date: 10/1/2004    
Commission Date: 6/1/2012    
Applicant: Clyde Windfarm (Scotland) Limited
Applicant Address: Inveralmond House 200 Dunkeld Road PERTH PH1 3AQ Scotland
Address: Clyde Windfarm (North) Crawford Biggar ML12 6UB Scotland
 
Assumptions: Capacity: 192303kW 192.303 MW,
Thus over the month Capacity * 720 hours per month = 138458.16 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 59506 30.94% Issued
01/02/2018 52406 27.25% Issued
01/01/2018 68176 35.45% Issued
01/12/2017 48149 25.04% Retired
01/11/2017 49632 25.81% Retired
01/10/2017 54658 28.42% Retired
01/09/2017 42293 21.99% Retired
01/08/2017 30720 15.97% Retired
01/07/2017 32232 16.76% Retired
01/06/2017 34474 17.93% Retired
01/05/2017 28216 14.67% Issued
01/04/2017 41574 21.62% Issued
01/03/2017 41090 21.37% Redeemed
01/02/2017 42121 21.90% Redeemed
01/01/2017 36844 19.16% Redeemed
Sep-16 027790 27790 14.45% Retired
Aug-16 022191 22191 11.54% Retired
Jul-16 022997 22997 11.96% Retired
Jun-16 09250 9420 4.90% Retired
Jun-16 09250 9420 4.90% Issued
May-16 024544 24544 12.76% Issued
Apr-16 023377 23377 12.16% Issued
Mar-16 020326 20326 10.57% Redeemed
Feb-16 029836 29836 15.52% Redeemed
Jan-16 036065 36065 18.75% Redeemed
Dec-15 040627 40627 21.13% Retired
Nov-15 034134 34134 17.75% Retired
Oct-15 021256 21256 11.05% Retired
Sep-15 013675 13778 7.16% Retired
Aug-15 021122 21122 10.98% Retired
Jul-15 2396123961 23961 12.46% Redeemed
Jun-15 2336523365 23365 12.15% Redeemed
May-15 35490 35490 18.46% Redeemed
Apr-15 2226822268 22268 11.58% Redeemed
Mar-15 35058 35058 18.23% Redeemed
Feb-15 2872428725 28725 14.94% Redeemed
Jan-15 38885 38885 20.22% Redeemed
Dec-14 34462 34462 17.92% Redeemed
Nov-14 2424124242 24242 12.61% Redeemed
Oct-14 3111431113 31113 16.18% Redeemed
Sep-14 99619764 9961 5.18% Redeemed
Aug-14 2594425944 25944 13.49% Redeemed
Jul-14 1086610758 10866 5.65% Redeemed
Jun-14 1097910825 10979 5.71% Redeemed
May-14 2184921849 21849 11.36% Redeemed
Apr-14 2770227702 27702 14.41% Redeemed
Mar-14 3717137171 37171 19.33% Redeemed
Feb-14 4330943309 43309 22.52% Redeemed
Jan-14 3952139522 1 0.00% Redeemed
Dec-13 4911449114 1 0.00% Redeemed
Nov-13 3031630316 1 0.00% Redeemed
Oct-13 4272442725 1 0.00% Redeemed
Sep-13 1928719287 1 0.00% Redeemed
Aug-13 1668316683 16683 8.68% Redeemed
Jul-13 1066210661 10661 5.54% Redeemed
Jun-13 1479314794 14794 7.69% Redeemed
May-13 3172631726 31726 16.50% Redeemed
Apr-13 2426224262 24262 12.62% Redeemed
Mar-13 3126131260 31260 16.26% Redeemed
Feb-13 2479224792 24792 12.89% Redeemed
Jan-13 3579535795 35795 18.61% Redeemed
Dec-12 3208332083 32083 16.68% Redeemed
Nov-12 3084830848 30848 16.04% Redeemed
Oct-12 1717517175 17175 8.93% Redeemed
Sep-12 2664626646 26646 13.86% Redeemed
Aug-12 1094710948 10948 5.69% Redeemed

 Calculations


Capacity: 919.999999999994
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/24/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 919.999999999994 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 355883

Project Info
Turbines going up at £35m wind farm
INVERCLYDE'S skyline is changing as the first of eight massive wind turbines is installed in the hills above Greenock.

MASSIVE Blades For InverCLYDE Windfarm Turbines Start Arriving
THE first convoys carrying huge turbine blades for a windfarm being built in the hills near Greenock travelled to the area today (Tuesday). Two trucks escorted by police motorbikes travelled to the site from King George V Dock in Glasgow.

Falls of CLYDE, Stonebyres Power Station Weir and Bridge
A Category A Listed Building in Lanark, South Lanarkshire

SSE - The Story of CLYDE wind farm
With 152 turbines and a capacity of 350MW, CLYDE is one of Europe's biggest wind farms.

Fairhurst: Renewables : Wind Farms
CLYDE Wind Farm. The site will host 152 Siemens 2.3MW 78.3m hub height turbines over 4700 hectares

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School