Location in the UK : England, Haydock Mersyside Latitude /Longitude: / Type of installation: Waste on/offshore: on Turbines:0 Capacity : 0 MW Technology : Installer: Owner : Operator : Eco2 Approx Date of 1st power generation: December 2005
Comment
There are now three engines installed at the site which can generate just over 5,000kW of renewable energy by burning landfill gas. This is enough to supply the equivalent of 9,500 homes.
Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.