Interactive Map of Renewable and Alternative Energy Projects in the UK



Click for Solar Panel Cleaning
Renewable Energy site management and grounds preparation.
Solar Panel Cleaning for optimum energy output.

Infra red survey
WSHWS: ||||| cansee:YES WindNot Logged on, Max pages: 5( Seen )
Loading

Todmorden Moor Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, West Yorkshire    
Type of installation: Wind    on/offshore: on
Turbines :5  Capacity : 15 MW
Approx Date of 1st power generation: September 2014

Wind Turbines, Wind Farm, Renewable Energy, Green Power

 Comment

The application was subject of an appeal to the Planning Inspectorate and in October 2009, the appeal was refused on a technical issue. As the Inspector concluded that the scheme would not affect the landscape character of the South Pennines, Coronation Power submitted a revised planning application to Calderdale Council who resolved to grant planning permission in January 2011 subject to legal agreement being agreed.

Coronation Power are presently considering a wind farm at Todmorden Moor consisting of up to five turbines. ach turbine will produce up to 3 MW of power, giving the site a potential output of up to 15 MW.

 Useful links and News items

Police to escort TODMORDEN MOOR Wind Farm turbine truckers
POLICE-escorted trucks will be driven through the Valley in November and December as turbines are transported to TODMORDEN MOOR Wind Farm.

Welcome to TODMORDEN MOOR
The moor is Common Land, open to the public for "quiet recreation".

TODMORDEN MOOR Wind Farm

objections to the TODMORDEN MOOR wind farm

Coronation Power

Relevant Google Search cansee = YES

 Turbine Make and Specs

Model: Nordex N90 Start Speed: 4
Capacity: 2.3 Optimal Speed: 12
Rotor Diameter: 90 Stop Speed: 25
Web Page: http://www.nordex-online.com/en/produkte-service/wind-turbines/n90-25-mw.html
Comment: N90 suits inland locations

 Address

Todmorden Moor Wind Farm Flower Scar Road Bacup OL13 9UX England

 Associated Companies.

Relationship Company (For: Todmorden Moor )
OperatorCoriolis Energy
DeveloperCoronation Power

 DECC Data on this Project: Todmorden Moor : / 372

Please note that where multiple DECC records are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Todmorden Moor - Resubmission     12.29 MW
Energy Type: Wind Onshore
County: West Yorkshire     Country: England     LPA: Calderdale Metropolitan Borough Council
Site ID and Reference: 3586 / A0457     District:
Applicant: Todmorden Moor Wind Farm Ltd     Application : 10/01057/WDF (Go to search to find Application)
For Wind Farms  
Number of Turbines: 5 Turbine Capacity: 3.00
Height of Turbines: Calculated capacity: 15
Site Address: Todmorden, Yorkshire
 
County: West Yorkshire Region: Yorkshire and Humber
OS Coordinates: 389600 / 389600
Development Status: Operational
Application Submitted: 9/10/2010 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 2/25/2013    
Generator Live 9/10/2014 This Record Last Updated: 6/22/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Todmorden Moor     15 MW
Energy Type: Wind Onshore
County: West Yorkshire     Country: England     LPA: Calderdale Metropolitan Borough Council
Site ID and Reference: 2729 / 07041W5     District:
Applicant: Coronation Power     Application : 07/00349/WDF (Go to search to find Application)
For Wind Farms  
Number of Turbines: 5 Turbine Capacity: 3.00
Height of Turbines: Calculated capacity: 15
Site Address: Todmorden, Yorkshire
 
County: West Yorkshire Region: Yorkshire and Humber
OS Coordinates: 389600 / 389600
Development Status: Appeal Refused
Application Submitted: 2/19/2007 Planning Permission Granted
Application Determined: Permission refused: 11/23/2007
Construction Date:    
Generator Live This Record Last Updated: 11/2/2011
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused: 10/12/2009
Granted: Appeal Granted: 11/23/2007

 OFGEM Data on this Project: Todmorden Moor: Wind :

Site Name: Todmorden Moor Wind Farm full
Scheme : REGO Generator ID: G02544NWEN
Capacity: 12290 Status: Live
Accreditation Date: 2/19/2007    
Commission Date: 10/9/2014    
Applicant: Todmorden Moor Wind Farm Ltd
Applicant Address: C/o Glennmont Partners Level 12A Tower 42, 25 Old Broad Street London EC2N 1HQ England
Address: Todmorden Moor Wind Farm Flower Scar Road Bacup OL13 9UX England
 
Assumptions: Capacity: 12290kW 12.29 MW,
Thus over the month Capacity * 720 hours per month = 8848.8 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
Oct-16 00 2701 21.98% Issued
Sep-16 02812 3124 25.42% Pending Tr
Aug-16 02948 3275 26.65% Pending Tr
Jul-16 02787 3097 25.20% Pending Tr
Jun-16 01194 1334 10.85% Pending Tr
May-16 02416 2684 21.84% Pending Tr
Apr-16 02629 2922 23.78% Pending Tr
Mar-16 02420 2689 21.88% Redeemed
Feb-16 04090 4545 36.98% Redeemed
Jan-16 04347 4831 39.31% Redeemed
Dec-15 03680 4089 33.27% Redeemed
Nov-15 02825 3139 25.54% Redeemed
Oct-15 01741 1934 15.74% Redeemed
Sep-15 01259 1399 11.38% Redeemed
Aug-15 01575 1750 14.24% Redeemed
Jul-15 21581942 2158 17.56% Redeemed
Jun-15 13551213 1355 11.03% Redeemed
May-15 47284255 4728 38.47% Redeemed
Apr-15 28232541 2823 22.97% Redeemed
Mar-15 47384264 4738 38.55% Redeemed
Feb-15 36093248 3609 29.37% Redeemed
Jan-15 50504545 5050 41.09% Redeemed
Dec-14 43693932 4369 35.55% Redeemed
Nov-14 32862957 3286 26.74% Redeemed
Oct-14 49874489 4987 40.58% Redeemed
Sep-14 1039935 1039 8.45% Expired

Site Name: Todmorden Moor Wind Farm full
Scheme : RO Generator ID: R00343RQEN
Capacity: 12290 Status: Live
Accreditation Date: 2/19/2007    
Commission Date: 10/9/2014    
Applicant: Todmorden Moor Wind Farm Ltd
Applicant Address: C/o Glennmont Partners Level 12A Tower 42, 25 Old Broad Street London EC2N 1HQ England
Address: Todmorden Moor Wind Farm Flower Scar Road Bacup OL13 9UX England


Data last updated: 8/22/2016 Is it still correct? Please tell me if there have been changes, see form below

Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

| Todmorden Moor | on |

Why not switch your own energy to Renewables?
Click here for renewable energy tariffs,
all renewable energy suppliers are listed



View All projects in this County

Map of 6 turbine locations can be seen by clicking here

energy map See below for list entries for the following technologies

Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

solar energy | Feed in Tariffs | Solar street lights |water testing |Letting Agents | lenham | pesticide residues | |Energy Price Comparison | Emergency Plumbing Insurance | bulk emergency water delivery
| Telephone and Broadband services for the home and business test VIP = 3293