Interactive Map of Renewable and Alternative Energy Projects in the UK



Loading

Royal Seaforth Dock Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Merseyside    
Latitude /Longitude: 53.4 / -3.1(rounded)   
Type of installation: Wind    on/offshore: on
Turbines :6  Capacity : 3.6 MW  Technology : Vestas V44
Approx Date of 1st power generation: April 1999

 Comment

This scheme comprises 6 x Vestas V44 turbines (600 kW each) with an installed capacity of 3.6 MW. It is owned and operated by Peel Energy and has been running since 1999 under a NFFO contract.

 Useful links

Relevant Google Search
Peel Energy: Seaforth Wind Farm
Port of Liverpool
Royal Seaforth Dock - Wikipedia


Wind Turbines, Wind Farm, Renewable Energy, Green Power

 Turbine Make and Specs: Vestas V44

Model: Vestas V44 Start Speed: 5
Capacity: 0.6 Optimal Speed: 15
Rotor Diameter: 0 Stop Speed: 25
Web Page:
Comment:

 Address

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Royal Seaforth Dock )

 DECC Data on this Project: Royal Seaforth Dock : / 327

Please note that where multiple DECC records are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

2574
Site Name: Royal Seaforth Dock Wind Farm     3 MW
County: Merseyside     Country: England     LPA: Sefton Council
Site ID and Reference: 4129 / 04076W3 Application :
District: Applicant: Mersey Docks and Harbour Company and Windcluster Limited
For Wind Farms  
Number of Turbines: 6 Turbine Capacity: 0.5
Height of Turbines: Calculated capacity: 3
Site Address: Royal Seaforth Dock Port of Liverpool Bootle, Sefton Merseyside
 
County: Merseyside Region: North West
Development Status: Operational
Application Submitted: 12/10/1995 Planning Permission Granted
Application Determined: Permission refused: 22/08/1997
Construction Date:    
Generator Live 24/04/1999 This Record Last Updated: 10/02/2003
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 22/08/1997

 OFGEM Data on this Project: Royal Seaforth Dock: Wind :

Site Name:
Scheme : Generator ID:
Capacity: Status:
Accreditation Date: 12/10/1995    
Commission Date:    
Applicant:  
Applicant Address:
Address:


Data last updated: 27/02/2014 Is it still correct? Please tell me if there have been changes, see form below

Recent News:

Sorry I found no matches, Please try again.


Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

| Royal Seaforth Dock | on |

Why not switch your own energy to Renewables?
Click here for renewable energy tariffs,
all renewable energy suppliers are listed


Map of 6 turbine locations can be seen by clicking here

energy map See below for list entries for the following technologies

Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

solar energy | Feed in Tariffs | Solar street lights |water testing |Letting Agents | lenham | pesticide residues | |Energy Price Comparison | Emergency Plumbing Insurance | bulk emergency water delivery
| Telephone and Broadband services for the home and business test VIP = 725