Location in the UK : England, Gloucestershire Latitude /Longitude: 51.666 / -2.266 Type of installation: Wind on/offshore: on Turbines:1 Capacity : 0.5 MW Technology : Installer: Owner : Operator : Approx Date of 1st power generation: December 1996
Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.