Interactive Map of Renewable and Alternative Energy Projects in the UK



Renewables Map gets over 60 times (yes 60) as much use as the Govt equivalent - read more 

Langage Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, Lanage Farm Near Plymouth    
Latitude /Longitude: 50.3 / -4.1(rounded)   
Type of installation: Solar    on/offshore: on
Solar Panels :21252  Capacity : 5 MW  Technology : Solar PV
Installer:Gehrlicher Solar  
Owner :  
Operator :
Approx Date of 1st power generation: Jluy 2011

 Comment

With more than 21,000 solar panels, the 15 million site, based at Langage Energy Park in Plympton is capable of generating 5MW of energy, which Yorkshire-based power-project developer, Carlton Power, has already begun exporting to the National Grid.

The solar park was constructed over a three month period by the UK subsidiary of German company Gehrlicher Solar AG, with the support of groundworks contractors Landscape Matters which is based at Langage.

Adding to the ever-increasing number of large-scale solar parks in the UK, Gehrlicher Solar has completed the Langage Solar Park 5MW, located near Plymouth. Built on an area of 14 hectares the project is expected to produce 4.95 million kilowatt hours of renewable energy each year, providing solar power to approximately 1,400 households.
Landscaping: Landscape Matters (company)

 Useful links

Relevant Google Search
Langage Energy Park
Langage Solar Farm: Planning
Langage Solar Farm Planning


Data last updated: 02/05/2014 Is it still correct? Please tell me if there have been changes, see form below

Recent News:

Updated: Just how many solar projects beat the fast-track review?
Ever since the first mention of the Fast Track Feed-in Tariff Review: how many projects will beat the August 1 cut-off? LANGAGE Westmill Hawton toyota marston Rhos-Y-Gilwen wheal jane jb wheaton hendra coombe
Source: spp, Date and Time of entry: 11 April 2014 00:00

Aceda case study: LANGAGE
Study by installers, including photos and maps: land adjacent to LANGAGE Energy
Source: aceda, Date and Time of entry: 19 April 2013 00:00

Just how many solar projects beat the fast-track review?
Westmill Solar Farm 5MW; LANGAGE Solar Park 5MW;Hawton Solar Park 5MW;Toyota Motor Manufacturing UK 4.6MW; Marston Solar Farm 4.51MW; Rhos-Y-Gilwen 2MW; Wheal Jane Solar Farm 1.4MW;
Date and Time of entry: 10 August 2011 00:00

15 million solar park connects to grid ahead of Feed in Tariff slash
With more than 21,000 solar panels, the 15 million site, based at LANGAGE Energy Park in Plympton is capable of generating 5MW of energy, which Yorkshire-based power-project developer, Carlton Power, has already begun exporting to the National Grid.
Source: tidevon, Date and Time of entry: 01 August 2011 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

| Langage | on |

Why not switch your own energy to Renewables?
Click here for renewable energy tariffs,
all renewable energy suppliers are listed


solar energy
SolarUK provides Solar Thermal & Solar PV for Industrial, Commercial and Domestic installations in the SouthEast of England. 0845 6890481 solar uk certificates

energy map See below for list entries for the following technologies

Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

solar energy | Feed in Tariffs | Solar street lights |water testing |Letting Agents | lenham | pesticide residues | |Energy Price Comparison | Emergency Plumbing Insurance | bulk emergency water delivery
| Telephone and Broadband services for the home and business test