Langage Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, Lanage Farm Near Plymouth    
Latitude /Longitude: 50.3 / -4.1(rounded)   
Type of installation: Solar    on/offshore: on
Solar Panels :21252  Capacity : 5 MW  Technology : Solar PV
Acreage:25   or approx Hectares : 10
Approx Date of 1st power generation: Jluy 2011


With more than 21,000 solar panels, the 15 million site, based at Langage Energy Park in Plympton is capable of generating 5MW of energy, which Yorkshire-based power-project developer, Carlton Power, has already begun exporting to the National Grid.

The solar park was constructed over a three month period by the UK subsidiary of German company Gehrlicher Solar AG, with the support of groundworks contractors Landscape Matters which is based at Langage.

Adding to the ever-increasing number of large-scale solar parks in the UK, Gehrlicher Solar has completed the Langage Solar Park 5MW, located near Plymouth. Built on an area of 14 hectares the project is expected to produce 4.95 million kilowatt hours of renewable energy each year, providing solar power to approximately 1,400 households.
Landscaping: Landscape Matters (company)

 Useful links

Relevant Google Search
Langage Energy Park
Langage Solar Farm: Planning
Langage Solar Farm Planning
cansee = YES


Lower Langage Farm Plympton Plymouth PL7 5AW England

 Associated Companies.

Relationship Company (For: Langage )
InstallerEZ Solar
DeveloperGood Energy
LandscapeLandscape Matters Ltd

 DECC Data on this Project: Langage : / 1983

Please note that where multiple DECC records are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Langage Solar Farm     5 MW
Energy Type: Solar Photovoltaics
County: Devon     Country: England     LPA: South Hams District Council
Site ID and Reference: 931 / AA255     District:
Applicant: Terrence O'Rourke Ltd     Application : 49/0277/11/F
--- For Solar Farms / Parks ---
Mounting of panels:
--- ----- ---- ---
Site Address: Land adjacent to Lower Langage Farm, Plympton, Plymouth
  PL7 5AW
County: Devon Region: South West
Development Status: Operational
Application Submitted: 21/01/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 15/07/2011 This Record Last Updated: 24/08/2011
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Langage: Solar : G04270PVEN

Site Name: Langage Solar Park
Scheme : REGO Generator ID: G04270PVEN
Capacity: 4970 Status: Live
Accreditation Date: 21/01/2011    
Commission Date: 15/07/2011    
Applicant: Langage Solar Park
Applicant Address: Carlton Power LtdCarlton House 4 Ellerbeck WayMIDDLESBROUGHTS9 5JZEngland
Address: Lower Langage FarmPlymptonPlymouthPL7 5AWEngland

Data last updated: 28/10/2014 Is it still correct? Please tell me if there have been changes, see form below

Recent News:

Updated: Just how many solar projects beat the fast-track review?
Ever since the first mention of the Fast Track Feed-in Tariff Review: how many projects will beat the August 1 cut-off? LANGAGE Westmill Hawton toyota marston Rhos-Y-Gilwen wheal jane jb wheaton hendra coombe
Source: spp, Date and Time of entry: 11 April 2014 00:00

Aceda case study: LANGAGE
Study by installers, including photos and maps: land adjacent to LANGAGE Energy
Source: aceda, Date and Time of entry: 19 April 2013 00:00

Just how many solar projects beat the fast-track review?
Westmill Solar Farm 5MW; LANGAGE Solar Park 5MW;Hawton Solar Park 5MW;Toyota Motor Manufacturing UK 4.6MW; Marston Solar Farm 4.51MW; Rhos-Y-Gilwen 2MW; Wheal Jane Solar Farm 1.4MW;
Date and Time of entry: 10 August 2011 00:00

15 million solar park connects to grid ahead of Feed in Tariff slash
With more than 21,000 solar panels, the 15 million site, based at LANGAGE Energy Park in Plympton is capable of generating 5MW of energy, which Yorkshire-based power-project developer, Carlton Power, has already begun exporting to the National Grid.
Source: tidevon, Date and Time of entry: 01 August 2011 00:00

Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

| Langage | on |

Why not switch your own energy to Renewables?
Click here for renewable energy tariffs,
all renewable energy suppliers are listed

One of our partners is actively looking to purchase both shovel ready and completed solar sites in the UK.

Click Here for Contact Details

Please leave your details and they will be in touch directly.

solar energy
Bulk Clean Water Delivery for Solar Panel cleaning in England and Wales
Call us on: 08456 808 820
Visit our website:

solar energy
SolarUK provides Solar Thermal & Solar PV for Industrial, Commercial and Domestic installations in the SouthEast of England.
01424 772 903
solar uk certificates

energy map See below for list entries for the following technologies

Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

solar energy | Feed in Tariffs | Solar street lights |water testing |Letting Agents | lenham | pesticide residues | |Energy Price Comparison | Emergency Plumbing Insurance | bulk emergency water delivery
| Telephone and Broadband services for the home and business test VIP = 657