Location in the UK : England, North West Latitude /Longitude: 54.655 / -2.830 Type of installation: Waste on/offshore: on Turbines:0 Capacity : 0.975 MW Technology : Installer: Owner : Cumbria Waste Management Operator : Approx Date of 1st power generation:
Comment
Once constructed, the facility will allow CWM Ltd to increase recycling of wastes collected at the adjacent Household Waste Recycling Centre and provide for more efficient haulage of recyclable waste collected in the Penrith area.
Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.