Location in the UK : Scotland, Loch Awe, Argyll Latitude /Longitude: 56.216 / -5.300 Type of installation: Hydro on/offshore: on Turbines:2 Capacity : 2.2 MW Technology : Pelton Installer: Owner : Npower Renewables Operator : Npower Renewables Approx Date of 1st power generation:
Comment
The run of river scheme was completed in 2006 and is capable of generating 2.2MW of clean electricity, which is enough to supply approximately 2,000 households.