Location in the UK : Scotland, Latitude /Longitude: 0 / 0 Type of installation: Hydro on/offshore: on Turbines:1 Capacity : 0.7 MW Technology : Installer: Owner : Operator : Npower Renewables Approx Date of 1st power generation: 2000
Comment
Capable of producing 700 kilowatts of green power from a single turbine Auchtertyre has been operational since 2000.
Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.