Location in the UK : Scotland, Perth and Kinross Latitude /Longitude: 56.706 / -4.019 Type of installation: Hydro on/offshore: on Turbines:0 Capacity : 34 MW Technology : Installer: Owner : Scottish and Southern Operator : Scottish and Southern Approx Date of 1st power generation: 1935
Comment
Part of the Tummel Hydro Electric Power Scheme : Includes Clunie, Cuaich, Ericht, Rannoch, Cuileig, Trinafour, Pitlochry, Loch Ericht , Errochty
Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.