Location in the UK : Scotland, Western Highlands Latitude /Longitude: 57.426 / -4.700 Type of installation: Hydro on/offshore: on Turbines:0 Capacity : 38 MW Technology : Installer: Owner : Scottish and Southern Operator : Scottish and Southern Approx Date of 1st power generation: 1963
Comment
Deanie is an underground station, capacity 38MW. The Monar dam, the only large arch dam to be built in the UK, is 520ft long and 123ft high.