Location in the UK : England, East Midlands Latitude /Longitude: 52.375 / -0.633 Type of installation: Waste on/offshore: on Turbines: Capacity : 0.575 MW Technology : Installer: Owner : Operator : Approx Date of 1st power generation:
Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.