Location in the UK : England, North Yorkshire Latitude /Longitude: 53.95 / -1.9 Type of installation: Wind on/offshore: on Turbines:4 Capacity : 1.2 MW Technology : WEG Installer: Owner : Operator : Approx Date of 1st power generation: December 1992
Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.