Site Name: Bodtegir     1.5 MW
Energy Type: Wind Onshore
County: Clwyd     Country: Wales     LPA: Conwy County Borough Council
Site ID and Reference: 6033 /     District:
Applicant: Clean Earth Energy     Application : 0/42466 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 1.5
Height of Turbines: 100 Calculated capacity: 1.5
Site Address: Land at Bodtegir, part of the, Mwdwl Eithin, Nant Bach Wind Farm On Land At, Corwen
  LL21 9AB
County: Clwyd Region: Wales
OS Coordinates: 299554 / 299554
Development Status: Operational
Application Submitted: 2/12/2016 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 6/21/2017    
Generator Live 11/1/2017 This Record Last Updated: 1/15/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 4/20/2021    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: