Site Name: Kirk Hill Wind Farm     18.8 MW
Energy Type: Wind Onshore
County: South Ayrshire     Country: Scotland     LPA: South Ayrshire Council
Site ID and Reference: 4988 /     District:
Applicant: Corolis Energy/ ESB     Application : 14/01646/APPM (Go to search to find Application)
For Wind Farms  
Number of Turbines: 8 Turbine Capacity: 2.3500000000000001
Height of Turbines: 110 Calculated capacity: 18.8
Site Address: Wallacetown-North West To, Hallowshean Cottage, Maybole, Strathclyde
 
County: South Ayrshire Region: Scotland
OS Coordinates: 226190 / 226190
Development Status: Under Construction
Application Submitted: 1/29/2015 Planning Permission Granted
Application Determined: Permission refused: 3/2/2016
Construction Date: 9/1/2022    
Generator Live This Record Last Updated: 8/31/2022
RO Banding (ROC/MWh) 0.9 FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged: 5/31/2016
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 3/2/2016

Caution: Please note that the location is taken directly from the DECC data. It is often based on the postcode so cannot be regarded as accurate. Postcodes used can be some miles, often the farm house location, from the project location.