Site Name: Beinn an Tuirc Windfarm Phase 3     49.9 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Argyll & Bute Council
Site ID and Reference: 3387 / B0801     District:
Applicant: Scottish Power Renewables     Application : 15/03057/PP (Go to search to find Application)
For Wind Farms  
Number of Turbines: 19 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 38
Site Address: Beinn An Tuirc Windfarm, Land At Meall Buidhe And South, A Chruach West Of Saddell Kin, Campbeltown, Strathclyde, Scotland
  PA28
County: Strathclyde Region: Scotland
OS Coordinates: 172270 / 172270
Development Status: Under Construction
Application Submitted: 11/3/2015 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 2/1/2020    
Generator Live This Record Last Updated: 5/28/2020
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 2/23/2020    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Caution: Please note that the location is taken directly from the DECC data. It is often based on the postcode so cannot be regarded as accurate. Postcodes used can be some miles, often the farm house location, from the project location. Go direct to Renewables Map Project data for Beinn an Tuirc Windfarm Phase 3